64ff0c6
Tighten [DOCS] story quality criteria and add re-evaluation on design…
redhat-chai-bot Oct 30, 2026
643a49f
Broaden DOCS re-evaluation triggers, unify criteria references, fix m…
redhat-chai-bot Oct 30, 2026
4049d5c
Condense DOCS re-evaluation blocks; broaden affected-set to scope-bas…
redhat-chai-bot Oct 30, 2026
eddd13b
Address PR review: renumber sync steps, add provenance check, fix dep…
redhat-chai-bot Oct 30, 2026
0417334
Fix test step-naming accuracy, reviewer severity scope, reference gua…
redhat-chai-bot Oct 30, 2026
945604c
Consolidate decompose to 10 steps; extend sync guard to creation; fix…
redhat-chai-bot Oct 30, 2026
4d3d3e9
Fix test accuracy: existence assertions, valid ordering, helper API, …
redhat-chai-bot Oct 30, 2026
b6e8772
Address seven review findings: placement rubric, guard callsites, def…
redhat-chai-bot Oct 30, 2026
a239a35
Strengthen placement rubric, guard ordering proofs, deferral complete…
redhat-chai-bot Oct 30, 2026
2030fba
Fix deferral reporting, reopened state, and placement identity precision
redhat-chai-bot Oct 30, 2026
70e1eb7
Align placement to full last-story rule, integrate identity gate, ext…
redhat-chai-bot Oct 30, 2026
846ed5b
Fix placement control flow and test precision
redhat-chai-bot Oct 30, 2026
9ecf246
Propagate references on placement fix; promote sizing/refs to main steps
redhat-chai-bot Oct 30, 2026
8cd0516
Fix ref-propagation test boundary, add file-link scope, add producer-…
redhat-chai-bot Oct 30, 2026
b30776b
Replace numeric placement with immutable-from-creation story identity
redhat-chai-bot Nov 2, 2026
86907b5
Qualify retirement for never-synced, add canonical identity rule, fix…
redhat-chai-bot Nov 2, 2026
3769687
Add review identity criterion, fix I/O encoding, coverage pointer, co…
redhat-chai-bot Nov 2, 2026
78eeaf3
Fix criterion ordering, Jira reparent clarity, test metadata, severit…
redhat-chai-bot Nov 2, 2026
5c47a97
Integrate provenance into Step 9 validation cycle before conditional …
redhat-chai-bot Nov 2, 2026
977f7ce
Integrate provenance as numbered Step 9 action with cap-gated re-review
redhat-chai-bot Nov 2, 2026
1309903
Add feature-wide dependency-first creation planning to /sync
redhat-chai-bot Nov 3, 2026
a9740a1
Fix creation planner: fail-closed refs, cycle distinction, preflight …
redhat-chai-bot Nov 3, 2026
cd23d62
Fix creation planner: epic refs, CLI exit codes, ref exclusion, avail…
redhat-chai-bot Nov 3, 2026
dfa6b47
Wire check-ref-availability into sync consumer, share ref extractor, …
redhat-chai-bot Nov 3, 2026
4155e0a
Fix review findings: exit semantics, QID fullmatch, unreachable branc…
redhat-chai-bot Nov 3, 2026
d10f106
Complete guard protocol: fail-closed partition, errexit-safe capture,…
redhat-chai-bot Nov 3, 2026
4fba01f
Quality gate, self-ref blocking, guard cleanup, preview fix, approval…
redhat-chai-bot Nov 6, 2026
f524bbb
Validation fixes: canonical ID, truthful diagnostics, inline cleanup,…
redhat-chai-bot Nov 6, 2026
92a639d
Review fixes: list-prefix extraction, unavailable-ref diagnostics, DO…
redhat-chai-bot Nov 9, 2026
bb3c6e6
Strengthen test evidence and instruction contracts for R1-R8 gaps
redhat-chai-bot Nov 9, 2026
b215a0c
Fix R1/R2/R7 test gaps: reversed order, mixed missing, capture recipe
redhat-chai-bot Nov 9, 2026
c6b3e5b
Fix F1-F4 functional contracts: partial resume, obsolete retirement, …
redhat-chai-bot Nov 9, 2026
a175dd5
Add shared active-coverage scope to review protocol, fix F3 test fide…
redhat-chai-bot Nov 9, 2026
9519a72
Fix retirement contract: active-epic scope, plan-ordered reconciliati…
redhat-chai-bot Nov 9, 2026
30941f6
Fix story-level retention input and active-only structure gates
redhat-chai-bot Nov 9, 2026
0cd592c
Bind Steps 3–7 consumers to active plan, prevent retired-record mutation
redhat-chai-bot Nov 9, 2026
3a43163
Preserve child marker distinction, require active child in epic gate,…
redhat-chai-bot Nov 9, 2026
614cfc4
Add source activity filter and cascade closure preview for sync
redhat-chai-bot Nov 9, 2026
d3158ef
Fix cascade identity, activity fail-closed, recipe capture, scope guard
redhat-chai-bot Nov 9, 2026
bc79280
Fix cascade scope guard union and invalid parent identity diagnostic
redhat-chai-bot Nov 9, 2026
3b63855
Fix orphan cascade union and add owning-parent preflight check
redhat-chai-bot Nov 9, 2026
2ed0e0a
Make owning-parent preflight unconditional for plan-creation-order
redhat-chai-bot Nov 9, 2026
6b05e9f
Add zero-epic CLI regression test for owning-parent preflight
redhat-chai-bot Nov 9, 2026
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
2 changes: 1 addition & 1 deletion design/SKILL.md
Original file line number Diff line number Diff line change
@@ -1,6 +1,6 @@
---
name: design
version: 0.14.0
version: 0.15.0
description: >-
Design-and-decompose workflow that takes a PRD, researches the problem space,
drafts a technical design document with a requirement-anchored testplan,
Expand Down
80 changes: 59 additions & 21 deletions design/decomposition-review.md
Original file line number Diff line number Diff line change
Expand Up @@ -63,19 +63,33 @@ expected and should not be flagged as a clarity problem.
## Evaluation Criteria

Evaluate the decomposition against these categories, prioritized by
impact:
impact. Coverage and completeness checks (criteria 1–8) apply to
effectively active artifacts only. A story is effectively active
when it has no `status: removed` marker and its parent epic is also
active. An epic is effectively active when it has no `status:
removed` marker. Epic-level checks (criteria 2, 4) evaluate active
epics; story-level checks evaluate effectively active stories.
Retained removed files are available for identity and traceability
audit (criterion 9) but do not satisfy or violate active coverage
requirements.

1. **Requirement Coverage** — Does the coverage matrix (`07-coverage.md`)
map every FR and NFR from the PRD? Do story acceptance criteria
map every FR and NFR from the PRD to effectively active stories? A
story is effectively active when it has no `status: removed` marker
and its parent epic is also active; stories with `status: removed`
and unmarked children of removed epics are retained for identity
audit but do not satisfy coverage. Do story acceptance criteria
collectively cover the PRD's acceptance criteria, not just the FR/NFR
descriptions? Are there stories without PRD traceability — and if so,
are they justified (e.g., infrastructure prerequisites)? Has any
requirement been silently dropped, deferred to "v2", or reduced in
scope?

2. **Epic Structure** — Is each epic organized around user value, not
technical layers? Does each epic deliver complete functionality
independently? Are T-shirt sizes assigned and consistent with the sizing rubric
2. **Epic Structure** — Evaluate active epics only (those with no
`status: removed` marker). Is each active epic organized around
user value, not technical layers? Does each active epic deliver
complete functionality independently? Are T-shirt sizes assigned
and consistent with the sizing rubric
(`../_shared/sizing-rubric.md`)? Does each epic's size match its scope
— story count, component breadth, integration surface? Are any epics
suspiciously uniform in size when their scope clearly varies? No epic
Expand All @@ -99,10 +113,10 @@ impact:
functionality AND testing (or, for a justified behavior-preserving
prerequisite, preserved-behavior tests)? Do `[QE]` stories define concrete e2e test
scenarios that validate user-facing behavior, not duplicate
unit/integration tests from `[DEV]` stories? Does each epic with
e2e-testable surface include at least one `[QE]` story? Does any
story fall back to "manual validation" or "document procedure for QE"
where an automated test could be written?
unit/integration tests from `[DEV]` stories? Does each active epic
with e2e-testable surface include at least one `[QE]` story?
Does any story fall back to "manual validation" or "document
procedure for QE" where an automated test could be written?

5. **Implementation Traceability** — Do stories correctly reference the
interface changes they implement and the test cases that validate
Expand Down Expand Up @@ -144,15 +158,39 @@ impact:
as gaps. Do not reject a legitimate prerequisite for adding no new
feature behavior — that is its nature.

8. **Documentation** — Do `[DOCS]` stories use the `[DOCS]` template
(Documentation Scope and Documentation Inputs instead of
Implementation Guidance and Testing Approach)? Does the Documentation
Scope describe what the reader needs to understand without prescribing
how to write or organize the documentation? Does the Documentation
Inputs section inventory all user-facing artifacts from the
implementation stories it references? Is the inventory detailed enough
for a documentation author to know what to look for in the
implementation?
8. **Documentation** — Do `[DOCS]` stories satisfy the `[DOCS]` story
quality criteria from the decompose skill that the reviewer can
evaluate from its available inputs (PRD and decomposition artifacts)?
Specifically: does the title include searchable product/feature/
command terms (not just `[DOCS] Feature documentation`)? Does the
persona/goal/benefit name the actual reader and a concrete task? Are
acceptance criteria reader-verifiable documentation outcomes (not
implementation artifacts)? Does the Documentation Scope describe what
the reader needs to understand without prescribing how to write or
organize the documentation? Does the Documentation Inputs section
inventory user-facing artifacts from the contributing `[DEV]`/`[UI]`
stories? Are `[Assumption]` and `[Open: §9.N]` markers present on
items that appear speculative or unresolved? Does the Design
Reference include a `Contributing stories` line consistent with the
Documentation Inputs headers? Are the contributing story references
complete? Note: the reviewer cannot verify whether unmarked
Documentation Inputs items are truly derived from the design
document or PRD — that provenance check belongs to the decomposer
(see the provenance verification in `/decompose`). Flag items that
appear speculative or unresolved from the PRD and artifact context
alone.

9. **Identity consistency** — Are story and epic IDs, filenames,
and directory paths self-consistent across the decomposition
artifacts? Do Dependencies, Contributing stories, Documentation
Inputs, and the coverage matrix reference story IDs that exist in
the actual artifact files? Do any instructions or comments
explicitly propose renaming, renumbering, moving, or reusing a
story/epic identity? Flag proven inconsistencies (e.g., a
referenced Story 2.03 with no corresponding file) or explicit
rename/reuse proposals. Absence of historical baseline does not
prove identity violation — do not invent allocation history or
require the sync manifest.

## Finding Format

Expand All @@ -179,9 +217,9 @@ Reference section.

| Severity | Meaning | Action |
|----------|---------|--------|
| CRITICAL | Would cause incorrect implementation — missing requirements, contradictory acceptance criteria, broken dependency chain, scope reduction, stories referencing non-existent ICs or TCs, ICs with no implementing story, prerequisite story without justification or dependency declaration | Must fix before presenting |
| HIGH | Would cause rework — story too large to review in a single PR, missing testing commitment, integration gap between stories, `[QE]` story duplicating `[DEV]` test scope, stories missing Interface Changes or Validated by references, prerequisite story missing preserved-behavior tests | Should fix before presenting |
| MEDIUM | Would reduce clarity — vague acceptance criteria, imprecise implementation guidance or documentation scope, sizing concerns, minor coverage matrix inconsistencies, minor IC or TC reference inconsistencies | Fix if it adds value |
| CRITICAL | Would cause incorrect implementation — missing requirements, contradictory acceptance criteria, broken dependency chain, scope reduction, stories referencing non-existent ICs or TCs, ICs with no implementing story, prerequisite story without justification or dependency declaration, `[DOCS]` story missing contributing stories or with Documentation Inputs that omit user-facing artifacts from referenced implementation stories | Must fix before presenting |
| HIGH | Would cause rework — story too large to review in a single PR, missing testing commitment, integration gap between stories, `[QE]` story duplicating `[DEV]` test scope, stories missing Interface Changes or Validated by references, prerequisite story missing preserved-behavior tests, `[DOCS]` story with generic title or unidentified reader/task, explicit proposal to rename, renumber, move, or reuse a story/epic identity that would break sync idempotency | Should fix before presenting |
| MEDIUM | Would reduce clarity — vague acceptance criteria, imprecise implementation guidance or documentation scope, sizing concerns, minor coverage matrix inconsistencies, minor IC or TC reference inconsistencies, `[DOCS]` story with Documentation Inputs items that appear speculative or unresolved from PRD and artifact context but lack `[Assumption]` or `[Open: §9.N]` markers (items verifiable against the PRD need no marker; the decomposer verifies design-derived provenance separately in the provenance sub-step of Step 9) | Fix if it adds value |
| LOW | Structural improvements — naming consistency, ordering suggestions, documentation clarity | Fix only if clearly valuable |

## Validation Rules
Expand Down
2 changes: 2 additions & 0 deletions design/guidelines.md
Original file line number Diff line number Diff line change
Expand Up @@ -30,6 +30,8 @@ artifacts and published output from this workflow.
- No Jira modifications without explicit user approval and a dry-run preview first.
- **No scope reduction.** Never silently simplify, defer to "v2", use "placeholder", or say "future enhancement" to reduce scope. If scope won't fit, propose a split — don't reduce.
- Locked decisions from PRD clarification are binding. No phase may contradict a locked decision without explicit user override.
- **Identity stability.** Once an epic or story file is created, its number, filename, and containing path are fixed. Do not rename, renumber, or move artifact files. New stories append above the highest existing number in their epic (including removed files); new epics append above the highest existing epic number. Gaps are allowed; retired numbers must not be reused. Title and content may change without renaming the file.
- **Retirement encoding.** Retirement is encoded as `status: removed` in YAML frontmatter — the `---`-delimited block at the very start of the file. The sync helper's `read_frontmatter` only recognizes this format; a plain Markdown body line `status: removed` is not detected. Merge into existing frontmatter without clobbering other fields; add a valid `---` block before the first heading if none exists.
- No committing to `main` directly. Use feature branches for `/publish`.

## Safety
Expand Down
69 changes: 65 additions & 4 deletions design/references/sync-helper-usage.md
Original file line number Diff line number Diff line change
Expand Up @@ -42,6 +42,9 @@ your responsibility.
| `render-description <file> <manifest> --type epic\|story [options]` | Render Jira-ready description with resolved refs |
| `update-manifest <manifest> --operation create\|update\|close --file <f> --jira-key <K> --content-hash <H> [--item-type epic\|story] [--epic-file <E>] [options]` | Record one successful Jira operation (`--epic-file` required for stories) |
| `compute-hash <file>` | Print SHA-256 of file content |
| `plan-creation-order <artifacts-dir>` | Plan dependency-first creation order for new stories; output JSON with `ordered`, `blocked`, `errors`, `satisfied_keys`. Exit 0 if plan is valid; exit 1 if `errors` is non-empty (JSON is still printed). Fatal I/O or manifest errors also exit 1 but print only to stderr with no JSON. |
| `check-ref-availability <artifacts-dir> <story-qid>...` | Check whether stories' referenced stories/epics have Jira keys; output JSON with `ready` and `blocked` lists. Exit 0 if all stories are ready; exit 1 if any story is blocked (JSON is still printed). Fatal manifest/I/O errors also exit 1 with stderr only and no JSON. |
| `compute-cascade-closures <artifacts-dir> [--close-orphans]` | Compute cascade child closures for parent epic closures (Step 3 preview). Output JSON with `cascades` list: manifest-active children under closing parents not already individually categorized as removed. Add `--close-orphans` when user selected option (a) for orphans in Step 1. |
| `migrate-manifest <manifest>` | Upgrade v1 manifest to v2 in place |

The `prepare` subcommand is preferred over separate `compute-hash` +
Expand All @@ -60,10 +63,12 @@ Jira keys from the manifest:
- `Stories 1.01, 2.01, 3.01` → resolve each → `EDM-XXXX, EDM-AAAA, EDM-BBBB`

The manifest is built incrementally: each issue's key is recorded
immediately after creation. Since epics are created first and stories
are created in epic order (Epic 1 stories before Epic 2 stories),
dependencies — which reference earlier stories — are always resolvable
by the time they're needed.
immediately after creation. Epics are created first (Step 5), then
all new stories are created in a feature-wide dependency-first order
planned by `plan-creation-order` (Step 6a) — each story's required
keys are available from the manifest by the time it is created. The
local numeric identifiers (Epic 1, Story 1.01) are
stable artifact identities, not creation readiness indicators.

If a reference cannot be resolved (the referenced item hasn't been
created yet or failed to create), the helper leaves the local
Expand Down Expand Up @@ -213,3 +218,59 @@ select the terminal/done-category transition. If multiple terminal
transitions are available, prefer "Done" over "Closed." If no terminal
transition is available from the current status, report the error and
let the user handle it in Jira.

## Reference-Availability Guard

Before calling `prepare` for a story in Steps 6a or 6b, verify that
every required reference has a Jira key. Run `check-ref-availability`
with the story's qualified ID:

```bash
REF_ERR=$(mktemp) || { echo "FATAL: cannot create temp file" >&2; exit 1; }
REF_EXIT=0
REF_CHECK=$(python3 "$SYNC_HELPER" check-ref-availability \
.artifacts/design/{issue-key}/ \
"story-{N}.{NN}" 2>"$REF_ERR") || REF_EXIT=$?
REF_ERR_TEXT=$(cat "$REF_ERR")
rm -f "$REF_ERR"
```
Comment thread
coderabbitai[bot] marked this conversation as resolved.
Resolved

The `|| REF_EXIT=$?` idiom captures a nonzero exit without aborting
under `set -e`. The two lines after the helper call read stderr text
and remove the temp file immediately — before branch interpretation
— so cleanup cannot be forgotten on any exit path. Apply the
three-branch interpretation from `../skills/sync.md` Step 6a (ready → proceed;
blocked → skip; catch-all → stop and report `REF_ERR_TEXT`).

The subcommand accepts one or more qualified IDs. For each story it:

1. Reloads the manifest fresh from `sync-manifest.json`
2. Reads the story's artifact file and extracts Dependencies (Story and
Epic refs) and Contributing stories (for `[DOCS]` stories only)
3. Checks that native Jira keys are treated as available (external)
4. Verifies the owning epic (`epic-{N}`) has a Jira key in the manifest
5. Returns JSON with `ready` and `blocked` lists

**Exit code:** 0 when all stories are ready; 1 when any story is
blocked.

**JSON output:**

```json
{
"ready": [
{"qid": "story-1.01", "refs": {"story-2.01": "EDM-201"}}
],
"blocked": [
{"qid": "story-1.02", "missing": ["epic-3"], "reason": "..."}
]
}
```

**Invariants:**

- Never mutates the manifest or source files
- Contributing stories affect creation ORDER but do NOT add native Jira
blocking relationships
- Keys recorded by `update-manifest` earlier in this run are immediately
visible (manifest is reloaded from disk on each call)