Skip to content

Pull requests: openshift/must-gather-operator

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

OAPE-886: Added evals in harness-evals approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#393 opened Aug 19, 2026 by shivprakashmuley Contributor Loading…
MG-357: Gate upload on gather success and propagate exit codes do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#391 opened Aug 19, 2026 by neha037 Contributor Draft
6 of 8 tasks
[release-5.0] OAPE-881: Added agentic docs backport-risk-assessed Indicates a PR to a release branch has been evaluated and considered safe to accept. lgtm Indicates that a PR is ready to be merged.
#389 opened Aug 18, 2026 by openshift-cherrypick-robot Loading…
[placeholder] add envtest based CRD validation approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#388 opened Aug 18, 2026 by swghosh Member Draft
1 task
MG-350: Proxy-aware SFTP validation (cherry-pick to release-4.22) jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#387 opened Aug 18, 2026 by neha037 Contributor Loading…
3 tasks done
NOJIRA: Dummy PR for oape-review-handler rehearsal
#385 opened Aug 13, 2026 by neha037 Contributor Loading…
MG-334: add user docs do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#377 opened Jul 28, 2026 by neha037 Contributor Draft
MG-183: Add namespace restrictions for must-gather jobs approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. qe-approved Signifies that QE has signed off on this PR tide/merge-method-squash Denotes a PR that should be squashed by tide when it merges. verified Signifies that the PR passed pre-merge verification criteria
#371 opened Jul 7, 2026 by neha037 Contributor Loading…
Add adapter to create Lightspeed Proposal after must-gather completion do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#365 opened Jun 18, 2026 by sakshiep1 Draft
6 tasks
chore: remove devppratik from owners approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged.
#362 opened Jun 12, 2026 by devppratik Loading…
Boilerplate: Update to 8fb7c801f68dc7e06e8d2ae138c2a98f0b234b56 approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged.
#359 opened Jun 9, 2026 by iamkirkbater Loading…
OCPBUGS-79069 - fix the since and sinceTime validation issue needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#345 opened Apr 30, 2026 by praveencodes Contributor Loading…
MG-230: Migrate to UBI10 base images for RHCOS10/RHEL10 compatibility jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#338 opened Apr 2, 2026 by KeenonLee Contributor Loading…
[WIP] MG-244: OTE migration for Support Log Gather do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#337 opened Mar 27, 2026 by KeenonLee Contributor Loading…
MG-61: minimal possible get/list RBAC for ServiceAccount running the Job approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#264 opened Aug 25, 2025 by swghosh Member Draft
fix make generate with tools approved Indicates a PR has been approved by an approver from all required OWNERS files. lifecycle/rotten Denotes an issue or PR that has aged beyond stale and will be auto-closed. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#263 opened Aug 25, 2025 by swghosh Member Loading…
MG-3: Build a guide for local operator development approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lifecycle/rotten Denotes an issue or PR that has aged beyond stale and will be auto-closed. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#246 opened Jul 16, 2025 by swghosh Member Draft
ProTip! no:milestone will show everything without a milestone.