Activity
Bisected both halves of this, first-parent between
ffa5b81band2b689c24, with the fixtures and
grader from the report and a
bisect step
whose thresholds were fixed from the two endpoints before starting:Property Last good First changed Before After Independent clocks refused cf0ef4422299622e(#3997)publisher exit 1 exit 0 Common clock clean 2f2ff7d3c87159d8(#4122)SCTE-35 168 packets, PID 121 audio 9,416 SCTE-35 6, audio 5,504 Each parent was graded directly. At
66440a6cthe independent-clock input already exits 0 and the
common-clock input is still clean, so it is two changes, not one. #4122 also takes programme 3's video
on independent clocks from 12,836 packets to 0.So my guess in the report was half right. #3997 turns the refusal into a re-timing. #4122 is the one
that loses content, and I think it is the shared anchor. Every track of the input maps through one
Anchor, and a backwards step overMAX_REORDER(500 ms) on any lane re-anchors the whole source.
The tracks stamped fromlast_ptsstep back each time the programmes alternate, and on
mpts3-cc.tsthey are up to 0.82 s apart. That part is from reading the diff, not measured; a
common-clock fixture with offsets under 500 ms would test it. Either way, the ask in the report is
unchanged: refusing a second PMT up front would make all of this moot.Tested the anchor guess from my last comment, and it's wrong. I modelled the section clock over the fixture's bytes: on
mpts3-cc.tsthe SCTE-35 lanes never step back more than 500 ms. They start a section about once a second, so the forward interval hides the offset between programmes. Only EIT does step back (9 times, up to 720 ms).Then I built more common-clock fixtures, some with no section lane stepping back past 500 ms, and ran each one on
2f2ff7d3,c87159d8and2b689c24:Fixture EIT steps > 500 ms P2 / P3 median offset SCTE-35 (141–143) parent / #4122 / main b7 0 (largest 160 ms) −40 / +40 ms 170 / 153 / 152 b3 0 (320 ms) +130 / −120 ms 168 / 71 / 38 b5 0 (280 ms) +320 / +60 ms 168 / 24 / 14 b8 1 (520 ms) 0 / −420 ms 170 / 12 / 9 b4 8 (920 ms) −20 / +760 ms 167 / 5 / 9 b6 10 (1,760 ms) −1,520 / +200 ms 160 / 3 / 3 The parent is clean on all of them, so it's still #4122. But b3 and b5 lose most of their SCTE-35 with nothing crossing
MAX_REORDER, and nothing is logged. Loss grows with the offset between programmes. Audio doesn't follow it (b4 loses 91 % of programme 1's MPEG audio, b1 none), so I don't know what drops the frames. One run per cell. Details and the model script are in T10. The ask is unchanged.K so a hang broadcast currently assumes a single clock. I'm going to add a flag to select a specific program, or publish all programs as separate broadcasts.
- addedquestBeing tracked/planned in a quest. See `quest/`Being tracked/planned in a quest. See `quest/`
on Sep 28, 2026 Found it. It's not the section lanes, it's the lane that feeds them.
last_ptsis advanced throughmedia_unwrapfor every video PES, whichever programme it belongs to. With programmes alternating in decode order, that lane steps back more than 500 ms, and since it's always on the current generation, each step re-anchors the whole source forward.Two patched builds of
2b689c24: A only logs re-anchors, and B also gives the section clock one lane per video PID (HashMap<Pid, PtsUnwrap>in place ofmedia_unwrapat that call site). One run per cell:Fixture A re-anchors A anchor drift A SCTE-35 / P1 audio B re-anchors B SCTE-35 / P1 audio parent b7 7 +4.1 s 153 / 9,348 0 171 / 9,532 170 / 9,532 b3 33 +19.8 s 62 / 7,496 0 169 / 9,540 168 / 9,240 b5 195 +113.8 s 21 / 6,584 0 171 / 9,532 168 / 9,536 mpts3-cc1,044 +688 s 17 / 7,056 0 174 / 9,620 168 / 9,420 programme 1 alone 0 — 171 / 9,688 0 177 / 9,820 — Every re-anchor in A comes from that call site. B removes all of them, and SCTE-35 and audio come back to the parent's level. I haven't traced how it reaches the audio lanes.
ts-programsorremove-livewould moot this, so it's for the record rather than a fix request. The patch and T10 have the details.- added a commit that references this issue
on Sep 29, 2026 Closing: #4505 answered this as asked. An unselected multiplex is refused,
--program <n>imports one programme, and--program allpublishes each as its own broadcast; #4580 then scoped the SI to the selected programme. Onmainat6f1a9e33, with the fixtures from this report, every programme was carried from both the independent-clock and the common-clock input, in four of four runs.
Summary
Feeding a real MPTS to
moq import tsdoes not produce an error on currentmain. With the programson independent clocks, which is how they arrive from separate encoders, the output timeline is
scrambled and most of one program is lost. With the programs on a common clock the video survives,
but audio has multi-second holes and most SCTE-35 sections are lost. The publisher exits 0 in both
cases and logs nothing about it. On either build, the exporter emits one program: a PAT with one
entry and one PMT listing every elementary stream. The carried SDT and EIT still describe the other
services, so the service layer contradicts itself.
The importer already scopes itself to single-program input in a comment (below), so this is not a
request for MPTS support as such. The ask is that an MPTS fails loudly, or is reduced to one program
on purpose, rather than being corrupted without a word.
Input
A 60 s MPTS built with TSDuck from three single-program clips: three programs, each with its own PMT,
PCR PID and elementary streams, plus one PAT and one SDT listing all three, and EIT present/following
for each. Clean at source: 0 continuity errors, and every PCR within 13 ticks (
pcrverify).It comes in two variants. In the first, the clocks are independent: program 1's PCR starts near
25,631 s and the other two near 3 s. In the second, programs 2 and 3 are re-timed by stream-copy remux
so that all three start within 0.82 s of each other.
What happens
On
main(2b689c24), independent clocksThe publisher runs to the end and exits 0. The subscriber receives 15.6 MB, where the common-clock
variant delivers about 86 MB:
Program 2 arrives whole, on its own timeline. The rest is re-timed across clocks:
83,968 s, against source clocks near 25,631 s and 3 s.
The only warnings, both from the subscriber:
On
main, common clock (two runs)The publisher exits 0 and video is intact on all three programs. The rest is not:
is sent alone through the same build. In the second run the PTS show eight holes of 2.7–4.1 s,
each about 0.45 s shorter than the last. AC-3 on program 1 shows nine holes, and program 3's MP2 three (0.8–1.8 s).
No warning is logged while any of this happens; the only warnings come at teardown.
Control: program 1 alone through the same build, extracted with
tsp -P zap 1 --stuffing --eit, is clean. Its SCTE-35 arrives (57 of 60 packets per PID), audio hasno holes, the EIT rate is within 9 % and PCR intervals stay at or below 25 ms. The losses need
several programs in one input.
On 0.12.1 (
ffa5b81b)With independent clocks the publisher aborts about 2 s in, in two runs out of two:
With a common clock it completes without the losses above. This is a better outcome than
main's,because it fails, but the error does not say that the input has more than one program.
The exporter, on both builds
Whenever enough survives to export, the output looks like this:
PMT PIDs 512 and 768 do not appear, and PIDs 529 and 785 carry no PCR. The SDT and EIT are carried
verbatim, so they still list services 2 and 3, which the PAT no longer has.
Why, as far as I can read it
One section clock. Private sections and SI snapshots are stamped with
last_pts(
rs/moq-mux/src/container/ts/import.rs). Every program's video writes that one field, and thecomment on it states the limit:
On 0.12.1 the alternation between program clocks trips
TimestampRewindon the section and SItracks, which is the abort.
Re-anchoring and one broadcast clock. Between the two builds,
import.rsgained per-streamre-anchoring below the live edge (fix(moq-mux): every TS elementary stream re-anchors below the live edge #3997) and publication on the broadcast clock (feat(cli): publish stdin imports on the broadcast clock #4122). My reading,
which I have not verified by bisecting, is that one or both now treat a jump between program clocks
as a wrap or restart and re-anchor rather than fail. That would explain the independent-clock
output, and possibly the audio and SCTE-35 losses on a common clock, where the clocks still differ
by up to 0.82 s.
One program record.
record_program_identitykeeps the first non-zero entry in the PAT. ThePAT arm then adds every PMT PID to
pmt_pids, so the elementary streams of every program becometracks of one broadcast. The exporter builds its PAT and PMT from that single record
(
table: vec![ProgramAssociation { .. }]inexport.rs).Reproducer
make-real-mpts.sh(TSDuck 3.44 and ffmpeg). Set
P2_OFFSET/P3_OFFSETfor the common-clock variant; the valuesare in the script header.
t10-moq.shruns relay,
export tsto file, andimport tsfed once at source rate bytsp -P regulate --pcr-synchronous.t10-grade.pygrades each program for PAT, PMT, SDT, EIT, continuity, PCR and every elementary stream.
Any two programs whose clocks start far apart should reproduce the independent-clock case. The
second program does not need audio or SI.
What would help, from where I sit
In rough order of cost; the first alone would close the silent part:
says so, before anything is published.
tsp -P zap <program>in front ofimport tsalreadygives a clean single-program feed. All three programs came through intact that way on 0.12.1,
and program 1 again on
main, so a refusal costs users nothing but a pipeline stage.--program <n>option that routes one program's PMT and drops theother programs' PIDs would make the reduction deliberate instead of accidental. It would also give
one broadcast per program, which is what the catalog model supports today.
and one program record per PMT in the catalog, so the exporter can rebuild the PAT and every PMT.
Only this one preserves the multiplex, and it is plainly the largest.
For whichever you choose, a regression test in the shape of the existing import tests: a synthetic
input with two programs whose video clocks start far apart. It should either fail with an error
naming the second program, or publish two programs that export as two.