Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
16 changes: 8 additions & 8 deletions grant-application/CONTENT_SCHEDULE.md
Original file line number Diff line number Diff line change
Expand Up @@ -159,10 +159,10 @@ Weekend days (6, 7, 13, 14, 20, 21, 27, 28) are removed.
| 17 | Wed Sep 30 | Two minutes, start to finish (posted) | H, C | ✓ | ✓ | | | ✓ | | ✓ |
| 18 | Thu Oct 1 | What does it cost? (posted) | D | ✓ | ✓ | | | | | ✓ |
| 19 | Fri Oct 2 | Paid as you work (posted) | E | ✓ | ✓ | ✓ | | | | ✓ |
| 22 | Mon Oct 5 | The number, week 4 | A | ✓ | ✓ | | | | | ✓ |
| 23 | Tue Oct 6 | Pay your team in your own token | B, E | ✓ | ✓ | ✓ | | | | ✓ |
| 24 | Wed Oct 7 | Open code, open data | C | ✓ | ✓ | | | ✓ | ✓ | ✓ |
| 25 | Thu Oct 8 | Is it safe? | D | ✓ | ✓ | | | | | ✓ |
| 22 | Mon Oct 5 | The number, week 4 (posted) | A | ✓ | ✓ | | | | | ✓ |
| 23 | Tue Oct 6 | Pay your team in your own token (posted) | B, E | ✓ | ✓ | ✓ | | | | ✓ |
| 24 | Wed Oct 7 | Open code, open data (posted) | C | ✓ | ✓ | | | ✓ | ✓ | ✓ |
| 25 | Thu Oct 8 | Is it safe? (posted) | D | ✓ | ✓ | | | | | ✓ |
| 26 | Fri Oct 9 | How teams pay people today | E, B | ✓ | ✓ | ✓ | | | | ✓ |
| 29 | Mon Oct 12 | The number, week 5 | A | ✓ | ✓ | | | | | ✓ |
| 30 | Tue Oct 13 | Thirty days in the open | A, G | ✓ | ✓ | ✓ | ✓ | | ✓ | ✓ |
Expand Down Expand Up @@ -571,7 +571,7 @@ Weekend days (6, 7, 13, 14, 20, 21, 27, 28) are removed.

## Week 4: Trust and depth (Oct 5 to Oct 9)

### Day 22, Mon Oct 5: The number, week 4
### Day 22, Mon Oct 5: The number, week 4 (posted)

> `SS_D22_metric-card` (A) · Outreach: Zero Authority (Z1), Grant Nissly (G2) · If a team registers this week, run the break-glass posts · Personal X: keep the bracketed line under 60 characters so the post stays within 280

Expand All @@ -592,7 +592,7 @@ Weekend days (6, 7, 13, 14, 20, 21, 27, 28) are removed.

---

### Day 23, Tue Oct 6: Pay your team in your own token
### Day 23, Tue Oct 6: Pay your team in your own token (posted)

> `SS_D23_own-token` (B, E), the master diagram with a blank token badge on the stream · Outreach: Privara (P1), Mithil Thakore (V1), Tycho (T3) · Replaces "Cancel it and see"; the cancel split now lives on Day 25

Expand Down Expand Up @@ -621,7 +621,7 @@ Weekend days (6, 7, 13, 14, 20, 21, 27, 28) are removed.

---

### Day 24, Wed Oct 7: Open code, open data
### Day 24, Wed Oct 7: Open code, open data (posted)

> `SS_D24_open-code` (C), precise terms allowed · Outreach: PaySats and DeepStack (GR1), Alex Miller (A1) · Re-run `npx vitest run` first and update the count if it changed

Expand Down Expand Up @@ -653,7 +653,7 @@ Weekend days (6, 7, 13, 14, 20, 21, 27, 28) are removed.

---

### Day 25, Thu Oct 8: Is it safe?
### Day 25, Thu Oct 8: Is it safe? (posted)

> `SS_D25_is-it-safe` (D), or reuse `SS_D23_cancel-split` if it was already produced · Outreach: Andre Serrano (S1), Ken Liao (K1)

Expand Down
15 changes: 11 additions & 4 deletions grant-application/M3_EVIDENCE_PACKAGE.md
Original file line number Diff line number Diff line change
Expand Up @@ -2,7 +2,7 @@

**Milestone 3 target:** 3 organisations registered and $10,000 equivalent streamed on Stacks mainnet.
**Grant:** Stacks Endowment, Q1 2026, Payments, Getting Started track.
**Started:** Sep 14, 2026. **Updated:** Oct 5, 2026. Updated daily while the campaign runs; every row below is verifiable from a public link or from the contract.
**Started:** Sep 14, 2026. **Updated:** Oct 9, 2026. Updated daily while the campaign runs; every row below is verifiable from a public link or from the contract.

This package follows the shape of `M1_EVIDENCE_PACKAGE.md` and `M2_EVIDENCE_PACKAGE.md`. It records what was actually shipped, not what was planned. The plan lives in `CONTENT_SCHEDULE.md`; if a day in the plan was not shipped, it is marked here as skipped, never quietly dropped.

Expand Down Expand Up @@ -52,7 +52,12 @@ One row per calendar day. A row is only filled in on the day it was posted. Post
| 20 | Oct 3 (Sat) | Building this alone | **Not posted (weekend)** | | |
| 21 | Oct 4 (Sun) | Bitcoin is the difference | **Not posted (weekend)** | | |

From Oct 4 the plan is weekdays only: Days 27 and 28 (Oct 10 and 11) are removed rather than skipped.
| 22 | Oct 5 | The number, week 4 | Official X, Personal X, WhatsApp | A | |
| 23 | Oct 6 | Pay your team in your own token | Official X, Personal X, LinkedIn, WhatsApp | B, E | |
| 24 | Oct 7 | Open code, open data | Official X, Personal X, Stacks Forum, Grantees TG, WhatsApp | C | |
| 25 | Oct 8 | Is it safe? | Official X, Personal X, WhatsApp | D | |

From Oct 4 the plan is weekdays only: Days 27 and 28 (Oct 10 and 11) are removed rather than skipped. The schedule's "Stacks Discord" posts have been published on the Stacks Forum.

**Standing rules every post obeyed:** one link per post, the follow line for @Stackstream0X from Day 3 onward, live numbers only, no deadlines, and the settlement language rule from `MARKETING_PLAN_V2.md`.

Expand All @@ -67,7 +72,7 @@ Reported in aggregate here. Individual names, message texts and reply status are
| Sep 14 to Sep 20 | 3 | 1 | 0 | One senior ecosystem contact has committed to trying the product after a scheduled committee meeting |
| Sep 21 to Sep 27 | 4 | 1 | 2 (Privara onboarding call; Zero Authority DAO X Space on Sep 25 and call on Sep 26) | The ecosystem operating partner that runs Stacks DeGrants replied, invited us to their X Space, held a call and proposed working together |
| Sep 28 to Oct 4 | [confirm] | | 0 | Product week: shipped streams in any token including a team's own, from one link |
| Oct 5 to Oct 11 | | | | |
| Oct 5 to Oct 11 | 8 so far (Oct 9) | 1 so far, with four follow-up exchanges | 0 | The Zero Authority contact registered the first workspace (Oct 6), then agreed a creator test: 5 creators, 20 USDA each over 7 days, funded by ZADAO from its own wallet, starting Oct 12. The official ZADAO DeGrants pilot follows it |

---

Expand All @@ -86,7 +91,7 @@ An organisation counts toward M3 only once its registration transaction confirms

| Date | Organisation | Registration tx | First stream tx | Token | Amount |
|---|---|---|---|---|---|
| | | | | | |
| Oct 6, 2026 | Grimaldo (contact at Zero Authority DAO, registered from his own wallet) | [0x0e1ddc99…3dceeb](https://explorer.hiro.so/txid/0x0e1ddc9926223f93a408c6390b8d3f5ceb5e09dd46756fe44f1347a93b3dceeb?chain=mainnet), block 9,134,238 | None yet | | |

---

Expand Down Expand Up @@ -122,3 +127,5 @@ Designed to `DESIGNER_BRIEF_SEP2026.md`. Filenames follow `SS_D##_slug_ratio`.
| Sep 24 | Open read-only API and integration guide, so any app can show live stream data | PR #27, `docs/INTEGRATION_GUIDE.md` |
| Oct 2 | Token amounts read from each token's own decimals everywhere, fixing 6-decimal tokens shown at 1/100 of their value | PR #30 |
| Oct 2 | Stream any token on Stacks, including a team's own, from search or a one-click link, with look-alike tokens flagged | PRs #31 and #32 |
| Oct 7 | Public organisations directory at stackstream.xyz/organisations, read live from the contract | PR #35 |
| Oct 8 | Streams link to the organisation that created them, and prepared setup links let a team check and sign a stream in one step | PR #37 |
Loading