6 changes: 6 additions & 0 deletions handoffs/return-of-control.md
Original file line number Diff line number Diff line change
Expand Up @@ -52,6 +52,12 @@ instantiated handoff under the actual authority.
| Follow-up | `<necessary-action-owner-and-trigger-or-none>` |
| Return destination and requested decision | `<responsible-owner-project-record-and-bounded-question>` |

For a completion return, use **Follow-up** to preserve the disposition of material
consequences outside the completed scope: the responsible owner and durable
work-record identity when deferred, or supporting rationale when inapplicable.
Apply [Planning's consequence guidance](../roles/planning.md#workflow-local-operational-guidance)
proportionately; vague future intent does not establish ownership.

Report only the state evidence supports. Distinguish completed authorized work
from unresolved architectural or operational completion. Preserve useful partial
work safely; do not use a stop report as permission to erase it, change scope, or
Expand Down
15 changes: 15 additions & 0 deletions roles/planning.md
Original file line number Diff line number Diff line change
Expand Up @@ -50,6 +50,21 @@ authority, protected effects, and justified constraints from forecast files or
techniques. Mark deliberate exact-change restrictions and the consequence they
protect. Implementation owns ordinary mechanics inside those boundaries.

Before claiming governed work complete, Planning asks: what material consequences
did this decision or change actually create, and where is each one owned?
Disposition each as handled in the current work, explicitly inapplicable with
supporting evidence or rationale, or durably owned elsewhere. Keep this check
proportionate: speculative, unsupported, or immaterial possibilities require
neither disposition records nor follow-up work.

Bounded scope separation is valid when ownership is retained. For a deferred
material consequence, preserve the actual responsible owner and durable work-record
identity. An existing issue, project record, roadmap item, or instantiated handoff
can suffice; no new issue or GitHub use is required. Labels such as `later`,
`separate work`, or `out of scope` alone do not establish ownership. A deferred
material consequence without a durable owner means completion is premature;
the current work need not absorb it.

When issue completion is part of the project contract, Planning/project authority
establishes the substantive completion boundary and whether merge is intended to
satisfy it. Distinguish material completion conditions from routine housekeeping.
Expand Down
3 changes: 3 additions & 0 deletions workflows/reviewed-change.md
Original file line number Diff line number Diff line change
Expand Up @@ -118,6 +118,9 @@ role. Preparing that handoff does not itself authorize the sender to execute it.
[return of control](../handoffs/return-of-control.md) on completion, interruption,
missing authority, or a new material decision. Publication can be absent; all
roles still return useful state, evidence, unresolved conditions, and follow-up.
Governed completion requires material consequences actually created by the work
to be handled, explicitly inapplicable, or durably owned, under
[Planning's consequence guidance](../roles/planning.md#workflow-local-operational-guidance).

Instantiated contracts, candidates, findings, and execution records remain with
the consuming project. This file supplies a reusable composition, not task state,
Expand Down