Repository navigation
Close phase 9 and open phase 10 - #29
Merged
Merged
Conversation
The roadmap closes phase 9 with PR #28 and records what it changed for later phases: one kept database for each question, kept memory that a library commit makes unusable, and a first smoke run that pays for extraction. Phase 10 is open as issue #26. The plan drops phase 9, and phase 10 says how its runs use --keep, --reuse, and --smoke --workers 4. Phase 11 gets a part that measures recall over a narrow scope in a shared table, because BM25 ranks the whole table before the namespace filter.
rohan-hotdata
requested review from
anoop-narang
and removed request for
a team
October 16, 2026 14:35
| issue and one pull request, worked in task order. When a phase closes, `roadmap.md` gets | ||
| memory store. The later phases moved to 12 to 15. Phase 9 closed on 2026-10-16 with PR | ||
| #28, and phase 10 is open as issue #26. This file holds the open workstream, phases 10 to | ||
| 15. Each phase becomes one GitHub issue and one pull request, worked in task order. When a phase closes, `roadmap.md` gets |
There was a problem hiding this comment.
super nit: Rewrap lines 6 to 9 to the width of the rest of the file, about 90 characters (not blocking). Line 8 runs to about 120 characters. The long line makes the source harder to read.
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
This PR closes phase 9 in the roadmap and opens phase 10. It changes only
docs/internal/roadmap.mdanddocs/internal/plan.md.What changes
src/hotmemorymakes unusable, and a first smoke run that pays for extraction.plan.mddrops phase 9 (its plan is at commit2df6881). Phase 10 says how its runs use--keep,--reuse, and--smoke --workers 4. Task 2 uses the fused memory kept by the phase 9 proof, and task 5 is one--keeprun for each chunk size, with--reusefor the other budgets.Verification
make verifypasses.