Repository navigation
ga-wdi-boston/git-github #3
Description
Activity
20 minutes actual
59 remaining items
1.5 actual. 90 mins.
Scheduled: 2-3:30pm
Actual: 3-4:30pm (10 minute break)The talk prior to this went over which is why the Actual Time is shifted an hour forward.
This talk also required some heavy white board diagrams. Maybe we could benefit from having the diagrams as image files in the repository or in the README. Of course, there is value to writing them out live with the developers as well.
I thought I was going really slow because of all the diagramming on the whiteboard but we stayed right on schedule.
1.5 actual. 80 mins.
Scheduled: 2:30-3:30pm
Actual: 3:30-4:50pm (10 minute break)The talks prior to this went over which is why the Actual Time is shifted an hour forward.
This talk again required some heavy white board diagrams. I posted the diagrams #15 in slack as I drew my own. It was pretty challenging to deliver in Room 5 because of the lack of white board area.
We diagrammed adding an additional
remotebranch and talked about why we would do that but the developers did not complete https://github.com/ga-wdi-boston/git-github#adding-your-own-remote on their own.
Summary
Using the Github to manage distributed over space and time.
Prerequisites