Skip to content

docs(cli): smartlog help still describes shipped overlays as future work #447

Description

@erishforG

Problem

parsec smartlog --help says PR/CI/review state will arrive “in later releases”, but the overlay shipped and the v0.5 smartlog epic (#245) is closed. This makes the active CLI surface disagree with implemented behavior.

Scope

  • Update the Smartlog long help to describe the current PR/CI/review overlay.
  • Add a CLI regression assertion so future help text does not drift back to the pre-release description.

Acceptance criteria

  • parsec smartlog --help accurately describes current overlay behavior.
  • CLI integration test verifies the shipped description.
  • No command signature or behavior changes.

@erishforG

Activity

  1. added a commit that references this issue on Sep 19, 2026
    3c80156
  2. erishforG commented on Sep 19, 2026

    @erishforG
    OwnerAuthor

    PR #448 was squash-merged into develop (3c80156). Closing this completed auto-improvement explicitly because develop is not the repository default branch.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    auto-improvementDaily auto-generated improvement PR/issue

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions