Skip to content

docs(interactive): record Phase 2 contract source recovery gate - #15

Merged
rockyshi1993 merged 20 commits into
mainfrom
docs/phase2-postmerge-source-register-20261112
Nov 12, 2026
Merged

rockyshi1993 merged 20 commits into
mainfrom
docs/phase2-postmerge-source-register-20261112

Conversation

@rockyshi1993

@rockyshi1993 rockyshi1993 commented Nov 12, 2026 •

Copy link
Copy Markdown
Contributor

Purpose

Keep the post-PR #14 roadmap accurate and record the recovered, verified Phase 2 source artifacts plus the remaining clause-by-clause conformance work.

Changes

  1. Update the roadmap to current main ae5fc5a42c67eb6e2c229d72ff4d9ac8e3aab3cd.
  2. Record post-merge main CI 43132513659 as 7/7 success.
  3. Record PR docs(interactive): Trusted Host V2 security boundary and native Grok acceptance design #14 as merged, preserving the distinction between a merged security design record and formal contract conformance.
  4. Add docs/interactive-phase2-formal-source-register.md with source identities, full SHA-256 values, archive validation, and conformance review steps.
  5. SRC-01 / Requirements V0.3: VERIFIED; 56,883 bytes, SHA-256 3a0adc3edb41869a6309bae29ec5496df00970c815f8dc16330a90cbf26e703e; Grok handoff archive 13/13 manifest entries PASS.
  6. SRC-02 / Technical Design V0.6-R5: VERIFIED; 114,621 bytes, SHA-256 09f3a5698e238d10b80efb8e26d1c41e51b663ca620efa70815dd7b52f2106ba; Confirmed Handoff archive 9/9 SHA256SUMS entries PASS. The same bytes/hash also appear in the Core POC evidence archive.
  7. SRC-03 Confirmed Handoff and SRC-04 Final Convergence Review are both located in the FlowKit Library. SRC-04 raw ZIP bytes have not yet been read; that is not a blocker for starting conformance review.
  8. Source-recovery blockage is closed. Final V0.3/V0.6-R5 clause-by-clause conformance remains PENDING REVIEW, not PASS.

Evidence

  • The uploaded FlowKit-Interactive-V0.6-R5-Confirmed-Handoff(1).zip contains TECHNICAL-DESIGN-V0.6-R5-CONFIRMED.md, explicitly titled “统一技术规范 V0.6-R5 · 正式确认版”. Its metadata says the user explicitly confirmed V0.6-R5 on 2026-11-10 and that this freezes the design, not implementation authorization.
  • Internal SHA256SUMS verifies all 9 files, including the V0.6-R5 design at the exact hash above.
  • The uploaded Core POC evidence ZIP contains a baseline copy of the same V0.6-R5 file with the identical SHA-256.
  • Do not confuse the separate Grok Development Handoff ZIP, which contains only Draft V0.3-R2 technical design, with the Confirmed Handoff.
  • No production source, tests, types, Program ABI, SQLite schema, or M5 receipt V1 is changed.

Next review work

Perform the formal traceability review against current main:

  • Requirements V0.3: T01–T34.
  • Technical Design V0.6-R5: normative §§1–18.
  • Historical design counterexamples R01–R22.
  • Grok targeted scenarios S01–S14.
  • Map each requirement/design clause to current source, tests, Trusted Host V2 design, and outstanding implementation gates. Record PASS, GAP, CONFLICT, NOT-IMPLEMENTED, or OUT-OF-SCOPE with evidence. Do not rewrite either confirmed source. Any proposed contract change requires a separate user decision.

Keep this PR Draft until the docs-only exact-HEAD CI and review pass. No Phase 3 implementation is authorized by this documentation PR; the previously adopted isolated H3-01/H3-05 OS-only work and non-production Grok capability PoC remain separate and must not alter frozen P0-A contracts.

Verified V0.6-R5 and Core POC evidence + audit plan

  • Confirmed Technical Design V0.6-R5 recovered from FlowKit-Interactive-V0.6-R5-Confirmed-Handoff(1).zip: 114,621 bytes, SHA-256 09f3a5698e238d10b80efb8e26d1c41e51b663ca620efa70815dd7b52f2106ba; internal handoff SHA256SUMS 9/9 PASS.
  • V0.6 Confirmed Handoff ZIP SHA-256: 2deb5b3fa60ed3b7c2d29f028e33835c47aaa0a976e947de717128caf7326549.
  • Core POC evidence ZIP SHA-256: a6b5201e8327463b57700174297bf986fbc4902c6ef6493710f1e8cac021f178; internal manifest 28/28 entries PASS.
  • Existing isolated Core POC report: 22/22 Node tests PASS, 9/9 process-kill recovery points, but only Linux x64 / Node 22.16. It is not the FlowKit production implementation or full POC-01..09 acceptance. POC-01/05/06/09 PARTIAL; POC-07 Human BLOCKED/Admin PARTIAL; POC-08 full matrix BLOCKED.
  • Added docs/interactive-v03-v06-conformance-audit-plan.md: full V0.3 T01–T34 and V0.6 §§1–18 crosswalk plan, R01–R22/S01–S14, separately sourced M6 C01–C24 and PR14 TH/SEC/NAT security extensions, POC gap closure, P0-A planning and later P0-B/P1/P2 gates.
  • Execution order follows V0.6-R5 §18 and APPROVAL-AND-POC-PLAN.md: preserve completed PoC evidence; target remaining PARTIAL/BLOCKED experiments; produce module-level P0-A plan; only then obtain explicit user authorization for production code changes.
  • No production source, tests, types, Program ABI, SQLite schema or M5 receipt V1 changed. No implementation authorization is created by this documentation PR.

Current plan revision: d8aebf2dad9c048a9ef5b3421d9e1fabc4d7fa2e. The audit plan explicitly distinguishes official V0.3/V0.6 requirements from later M6 and PR14 security matrices; none of those supplementary identifiers may be silently promoted into the original approved requirements.


Note

Low Risk
Documentation-only traceability updates; no production code, tests, ABI, or schema changes.

Overview
Aligns Phase 2 documentation with main after PR #14 (ae5fc5a…) and post-merge CI 7/7 PASS, and distinguishes a merged Trusted Host V2 design record from formal V0.3 / V0.6-R5 conformance (still not PASS).

Adds interactive-phase2-formal-source-register.md to log recovered contract artifacts (Requirements V0.3, Technical Design V0.6-R5, handoff/POC ZIPs) with full SHA-256 and archive checks, PoC evidence limits, and closure of the F-07 “missing originals” gate.

Adds interactive-v03-v06-conformance-audit-plan.md with the clause-by-clause review workflow (T01–T34, V0.6 §§1–18, R/S/C/PR #14 security extensions, POC gaps, P0-A mapping) and explicit stop rules—no implementation authorization.

Updates the roadmap Phase 2 row and new §2.1–2.2 sections so source recovery is complete and conformance review is IN-PROGRESS, with links to the two new docs and the approved PoC follow-up sequence.

Reviewed by Cursor Bugbot for commit 7ca31ce. Bugbot is set up for automated code reviews on this repo. Configure here.

@rockyshi1993
rockyshi1993 marked this pull request as ready for review November 12, 2026 03:09
@rockyshi1993
rockyshi1993 merged commit 13d573c into main Nov 12, 2026
10 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant