Repository navigation
docs(interactive): record Phase 2 contract source recovery gate - #15
Merged
rockyshi1993 merged 20 commits intoNov 12, 2026
Merged
Conversation
…rkdown code spans
rockyshi1993
marked this pull request as ready for review
November 12, 2026 03:09
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Purpose
Keep the post-PR #14 roadmap accurate and record the recovered, verified Phase 2 source artifacts plus the remaining clause-by-clause conformance work.
Changes
ae5fc5a42c67eb6e2c229d72ff4d9ac8e3aab3cd.docs/interactive-phase2-formal-source-register.mdwith source identities, full SHA-256 values, archive validation, and conformance review steps.3a0adc3edb41869a6309bae29ec5496df00970c815f8dc16330a90cbf26e703e; Grok handoff archive 13/13 manifest entries PASS.09f3a5698e238d10b80efb8e26d1c41e51b663ca620efa70815dd7b52f2106ba; Confirmed Handoff archive 9/9 SHA256SUMS entries PASS. The same bytes/hash also appear in the Core POC evidence archive.Evidence
FlowKit-Interactive-V0.6-R5-Confirmed-Handoff(1).zipcontainsTECHNICAL-DESIGN-V0.6-R5-CONFIRMED.md, explicitly titled “统一技术规范 V0.6-R5 · 正式确认版”. Its metadata says the user explicitly confirmed V0.6-R5 on 2026-11-10 and that this freezes the design, not implementation authorization.Next review work
Perform the formal traceability review against current main:
Keep this PR Draft until the docs-only exact-HEAD CI and review pass. No Phase 3 implementation is authorized by this documentation PR; the previously adopted isolated H3-01/H3-05 OS-only work and non-production Grok capability PoC remain separate and must not alter frozen P0-A contracts.
Verified V0.6-R5 and Core POC evidence + audit plan
FlowKit-Interactive-V0.6-R5-Confirmed-Handoff(1).zip: 114,621 bytes, SHA-25609f3a5698e238d10b80efb8e26d1c41e51b663ca620efa70815dd7b52f2106ba; internal handoff SHA256SUMS 9/9 PASS.2deb5b3fa60ed3b7c2d29f028e33835c47aaa0a976e947de717128caf7326549.a6b5201e8327463b57700174297bf986fbc4902c6ef6493710f1e8cac021f178; internal manifest 28/28 entries PASS.docs/interactive-v03-v06-conformance-audit-plan.md: full V0.3 T01–T34 and V0.6 §§1–18 crosswalk plan, R01–R22/S01–S14, separately sourced M6 C01–C24 and PR14 TH/SEC/NAT security extensions, POC gap closure, P0-A planning and later P0-B/P1/P2 gates.APPROVAL-AND-POC-PLAN.md: preserve completed PoC evidence; target remaining PARTIAL/BLOCKED experiments; produce module-level P0-A plan; only then obtain explicit user authorization for production code changes.Current plan revision:
d8aebf2dad9c048a9ef5b3421d9e1fabc4d7fa2e. The audit plan explicitly distinguishes official V0.3/V0.6 requirements from later M6 and PR14 security matrices; none of those supplementary identifiers may be silently promoted into the original approved requirements.Note
Low Risk
Documentation-only traceability updates; no production code, tests, ABI, or schema changes.
Overview
Aligns Phase 2 documentation with main after PR #14 (
ae5fc5a…) and post-merge CI 7/7 PASS, and distinguishes a merged Trusted Host V2 design record from formal V0.3 / V0.6-R5 conformance (still not PASS).Adds
interactive-phase2-formal-source-register.mdto log recovered contract artifacts (Requirements V0.3, Technical Design V0.6-R5, handoff/POC ZIPs) with full SHA-256 and archive checks, PoC evidence limits, and closure of the F-07 “missing originals” gate.Adds
interactive-v03-v06-conformance-audit-plan.mdwith the clause-by-clause review workflow (T01–T34, V0.6 §§1–18, R/S/C/PR #14 security extensions, POC gaps, P0-A mapping) and explicit stop rules—no implementation authorization.Updates the roadmap Phase 2 row and new §2.1–2.2 sections so source recovery is complete and conformance review is IN-PROGRESS, with links to the two new docs and the approved PoC follow-up sequence.
Reviewed by Cursor Bugbot for commit 7ca31ce. Bugbot is set up for automated code reviews on this repo. Configure here.