Skip to content
Merged
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
9 changes: 9 additions & 0 deletions docs/WORKSPACE.md
Original file line number Diff line number Diff line change
Expand Up @@ -160,6 +160,15 @@ git rev-parse <sha>:<path> origin/main:<path> # two equal lines: same bytes
On 19 October 2026, main#330's head `88ff9223` was not in `main`, but its
`PROOF.md` blob was.

Editing a pull request's title or body re-runs the required `public-intake`
check, because its workflow listens for `pull_request_target` type `edited`.
While that run is queued or in progress, a guarded merge is refused with HTTP
405 ("Required status check `public-intake` is queued"). Once an integrator has
picked up a pull request, others record late facts in a comment instead of
editing the body, and an integrator that edits the body lets the new run finish
before merging. On 20 October 2026 this refused the first merge attempt on
main#450 and on main#467.

## Local navigation check

The landing workflow's `landing-checks` job first requires that the same run's
Expand Down
Loading