[Unit PRs] Complete required skeleton and batch reviews before PR readiness #559

Description

@JWThewes

Part of #553. Suggested step 5 of 13; one focused PR into main.

Outcome: A unit-to-base PR cannot become ready through the platform until the required stage, skeleton and batch reviews governing its publication are satisfied.

Depends on: #555, #558

Scope

  • Move the applicable walking-skeleton and batch review boundary before publication readiness for the new policy only, using the selected effective workflow plan.
  • Request-changes revises unmerged unit work and reruns affected sensors/checks. Preserve existing autonomy modes, recorded answers, park/resume and the ordinary stage approval contract.
  • Separate successful lane preparation from delivered integration so the review loop does not require the work to be merged first.
  • Require current run/attempt and reviewed-head identity at readiness; preserve old history paths and old strategy gate ordering.

Acceptance criteria

  • Skeleton and gated-batch fixtures cannot mark a PR ready before their required approvals.
  • Request-changes keeps work unpublished and re-asks only the appropriate gate after revision and validation.
  • Autonomous and skeleton-off modes preserve their selected policy without acquiring a blanket new approval gate.
  • Stale callback, revised head, failed sensor and superseded plan cannot reuse an earlier approval incorrectly.
  • Focused orchestration/park-resume and frozen-history replay tests pass; readiness authorization remains distinct from external provider merge permissions.

PR boundary and rollout

Pre-publication gate ordering and revision semantics only. No provider merge authority, named-reviewer rules, branch-protection edits, tracker changes, or automatic rollback after an external merge.

Starting points

lambda/v2-orchestrator/section.js, lambda/v2-orchestrator/index.js, lambda/shared/v2-process-store.js.

Planning baseline: main at b5d68d5d2f12292d56a21aab917e4d8f9538aa0b (2026-10-15). Recheck current main and applicable guidance before implementation. Existing strategies remain supported; the new capability stays disabled until qualification.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    area/backendLambda APIs, lambda/shared, v2-orchestratortopic/deliveryWork sent to Git: branches, commits, pull requests, merge

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions