Repository navigation
docs(plan): record the M1.6 application check as run, and close M1 - #41
Merged
Merged
Conversation
The last open box in M1 was the one no test could tick: a person opening the repaired deck and seeing the chart's category labels laid out right-to-left. Schema validity is not that claim, and the item said so. The maintainer ran it. A repaired `torture.pptx` opened in PowerPoint with no repair prompt, no error, and the text laid out right-to-left. The item is ticked with the date, and the acceptance line above it drops its "met for the machine half" hedge, because both halves are now met. The check stays human and is recorded rather than automated. The note added with it says the next writer that creates a part from nothing — the chart `c:txPr` was the first — should be run the same way before its own item is ticked, so the precedent travels with the plan instead of living in one merged pull request. M0 through M5 are now clean; M6 and M7 are what remain.
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Docs only. No code changed.
M1's last open box was the one no test could tick —
docs/PLAN.md§1.6:It has now been run
The maintainer opened a repaired
torture.pptxin PowerPoint:The item is ticked with the date it was run. The
*Acceptance:*line above it drops its "met for the machine half" hedge, since both halves are now met.The check stays human
It is recorded here rather than automated, because the thing being verified is what a rendering engine does with a part mirsam wrote — which is exactly what a schema validator cannot answer. The chart
c:txPrwas the first part the writer creates from nothing rather than edits in place, so the note added with the item says the next writer to do that should be run the same way before its own box is ticked. The precedent travels with the plan instead of living in a merged PR.Where the plan stands
M0 through M5 are clean. M6 (PDF, read-only) and M7 (Distribution) are what remain.