Description
Measurement
Window: 2026-10-09 16:16–20:16 UTC. Data: all 299 CI pull_request runs in the window (3 listing pages), plus job detail for 22 of them.
- 202 of the 299 runs were full runs: about 172 jobs, still running or lasting more than 6 min. The other 97 were draft or skip runs of 30 jobs, mostly skipped.
- 46 of the 202 full runs (23%) ran on a head commit that only merges
maininto the PR branch. The head commit's first line wasMerge remote-tracking branch 'origin/main' into …,Merge branch 'main' into …orMerge main …. Two more were cancelled early. - By hour: 32 of 95 PR runs created 18:00–19:00 were merge-main heads, and 14 of 41 between 19:00 and 20:00. This followed Repin live minimist@1.2.2 suites to republished patch 642d7f02 (#1293) #1301 landing on main at 18:02, when about 80 open agent branches re-synced.
- Examples:
- 37983012523 (
agent/v5-nuget-mapping) - 37982493866 (
agent/v5-nuget-lock-reader) - 37981753120 (
ci/depot-linux-runners) - 37979308752 (
agent/v5-cargo-stale-rlib)
- 37983012523 (
- A full PR run costs ~353 Linux + ~65 Windows job-min (median of the sampled full PR runs, n=12).
Where the time goes
- 46 × 353 ≈ 16,000 Linux + 3,000 Windows job-min in this 4-hour window, spent re-testing PR diffs that had not changed. Only
mainmoved under them. - They landed in the 18:00–20:00 burst that put
ubuntu-latestqueue wait at p50 16.6 / p90 18.9 min at 19:00. Merge-group runs took 77–81 min instead of ~22 (see CI perf: ci-ok — waits 9–18 min for anubuntu-latestrunner whileubuntu-22.04starts in <1 min (merge-queue critical path, backlog hours) #1372 and CI perf (settings): merge queue builds 5 entries at a time — a 13-PR burst took 100 min to drain on a 21-min CI run (~21 min per PR past the 5th) #1248).
Root cause
- With a merge queue, a PR doesn't need to be up to date with
main. The queue re-tests every entry on top of the latestmainbefore it merges. - Agent sessions still merge
maininto their branches after each landing, usually with no conflict. Each such push triggers the full PR tier again. concurrency(cancel-in-progresson PRs) cancels only the superseded run on the same branch. It does nothing about the burst across about 80 branches.
Proposed fix
Two parts. Either one helps on its own.
- CI side (M), in
ci.yml's preflight /dispatch-testsjob:- If the PR head is a 2-parent merge whose second parent is on
origin/main, check whether the PR's own diff is unchanged. Comparegit diff $(git merge-base origin/main HEAD) HEADwithgit diff $(git merge-base origin/main HEAD^1) HEAD^1bygit patch-id --stable. - If it is unchanged, look up the newest
CIrun forHEAD^1. That is one REST read:actions/runs?head_sha=<HEAD^1>&event=pull_request. - If that run concluded
success, emit an output (for examplereuse=true) that makes the heavy jobs skip (if: needs.dispatch-tests.outputs.reuse != 'true'), the same way the draft tier skips today. - Otherwise run the full tier. That covers conflict resolutions, a failed or missing previous run, and API errors.
clippykeeps running, so a compile break frommainis still caught on the PR.- This mirrors the identical-SHA reuse ci: reuse the merge-queue verdict on main and trim coverage/sbt work #1355 proposes for push-to-main.
- If the PR head is a 2-parent merge whose second parent is on
- Process side (S): in
AGENTS.md, tell agent sessions not to mergemaininto a PR branch unless it has a conflict or needs a change frommain. The merge queue already tests against the latestmain.
Expected saving
- About 23% of full PR runs during a post-landing burst. That is ~16k Linux + ~3k Windows job-min per 4 h at today's burst level.
- Conservatively ~20–30k Linux + ~4–6k Windows job-min/day, since bursts follow each batch of landings.
- Indirectly, it shrinks the
ubuntu-latestbacklog behind merge_group runs, which was the cause of the 77–81 min groups today. - PR feedback latency on a merge-main push drops from ~22 min (unloaded) to about 2 min (
clippyplus preflight).
Coverage and risk
- Every test still runs on the PR diff, on the previous head, and again in the merge queue against current
mainbefore merging. The skip applies only to a clean merge whose PR diff is byte-identical to a head that already passed. ci-okandclippykeep their names. Skipped needed jobs already count as passing inci-ok.- Risk: a semantic conflict between
mainand the PR shows up only in the merge queue, about 20 min later, not on the PR. That is the same guarantee the queue provides today. - Risk: patch-id equality on a merge with conflict resolution. Any resolved hunk changes the PR diff, so the patch-id differs and the full tier runs.
Effort
M for the CI side. S for the process side.
ROI
Saving ≈ (25k Linux ×1 + 5k Windows ×2) / 1000 = 35 × confidence 0.5 ÷ effort 2 = 8.8
Generated by Claude Code
Reactions are currently unavailable
Metadata
Metadata
Assignees
Labels
agent:triagedci-perfCI / merge-queue performance finding (profiler routine)CI / merge-queue performance finding (profiler routine)priority:p3
Activity
mikolalysenko commentedon Oct 11, 2026
[agent] Claiming this issue (shared root cause: PR CI re-runs the whole lean tier when a push only merges main and the PR diff is unchanged). Branch: agent/fix-ci-pr-merge-main-reuse. Claim-ID: 2026-10-11T11:51:06Z-1151a8
Generated by Claude Code
mikolalysenko commentedon Oct 11, 2026
[agent] Fix in draft PR #1383: PR runs whose head only merges main, with the PR diff unchanged and the previous head green, skip the build/test jobs (~30.5 → ~3.9 job-min per such push).
Generated by Claude Code
mikolalysenko commentedon Oct 11, 2026
CI profiler, 2026-10-11 12:17 UTC. Fresh numbers for #1383's saving.
Since this issue was filed, #1375 (lean gate) and #1362 (Depot Linux) cut a full PR
CIrun from 353 Linux + 65 Windows job-min to ~30 Depot Linux job-min (p50 29.8, n=25 sampled runs, 0 Windows, 0 macOS). Depot queue wait is now p50/p90 0.02/0.02 min, so theubuntu-latestbacklog this issue fed is gone.Over the last 24h there were 75 PR
CIruns, about 2,240 Depot job-min (weekend volume). At the 23% merge-main share measured earlier, #1383's ceiling is now ~500 Linux job-min/day (maybe 2–3× on weekdays), down from 20–30k. Its runs don't block anything: PR push →ci-okp50 is 7.2 min. #1383 is still worth landing as cheap hygiene. The issue's ROI drops from 8.8 to ~0.4 on the dashboard scale.Generated by Claude Code