Roadmap: S06 done (documentation only)

This updates documentation/SIMULATION_ROADMAP_Q4_2026.md after the S06 merges:

PR Merge commit
SAM-BIM/SAM_Deploy#66 1657bb53c7b1d1a82f0c5d9c57c7d7a02705cd31
SAM-BIM/SAM_OpenStudio#32 a9429f7cea975a8f660bac4407779c3828e86627
SAM-BIM/SAM_Validation#16 e9a83df0c2e1162d0a22eb1e010a508044117e12

Each repository has its PROJECT_PROGRESS.md closeout on sow/2026-Q4: SAM_Deploy 3b7edb0, SAM_OpenStudio 7f21665, SAM_Validation 2a3acfa.

The changes:

  • S06 row: Done, with the merge SHAs, and provenance labelling recorded as Not PASS, accepted limitation.
  • Phase A gate: met, with one explicit owner-accepted exception, the S06 provenance-labelling check. Phase B starts only with an owner start of S07.
  • Owner decision 6: the S06 outcome. An installed build needs no SAM_COMMIT, but its producers report the SAM_Deploy build revision as samCommit/runnerCommit. The repository revisions come from that commit's gitlinks, and historical records keep their meaning.
  • Task log, S06 entry:
    • the payload change;
    • the genuine-installer acceptance (Tas/OpenStudio/Both PASS from the real ribbon, numerically the same as S05). OpenStudio's raw exactMatch: false comes only from run-generated subsurface names, mapped 1:1 through their host-panel references;
    • the repinned-build payload equivalence (0 drift);
    • the accepted limitation;
    • what was not covered.
  • "No task is active": S07 is the next candidate and needs an explicit owner start.

No code, schema, workflow, gitlink or tracker change. S07, F2/F8/F9, tolerances and Phase C are untouched, and there is no release, tag or deployment.

Needs owner review and a separate merge authorization (roadmap rule: changes go through a reviewed PR). The PROJECT_PROGRESS.md closeout follows the merge.

🤖 Generated with Claude Code

…th one accepted limitation

S06 merged: SAM_Deploy#66 1657bb53, SAM_OpenStudio#32 a9429f7c,
SAM_Validation#16 e9a83df0. Genuine installed-candidate Tas/OpenStudio/Both
PASS; provenance check 9 recorded as Not PASS: accepted limitation
(installed samCommit/runnerCommit = SAM_Deploy build revision). Phase A
gate met with that explicit exception; S07 needs an owner start.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@michaldengusiak
michaldengusiak merged commit d8c33f8 into sow/2026-Q4 Oct 20, 2026
3 checks passed
@michaldengusiak
michaldengusiak deleted the docs/roadmap-s06-closeout branch October 20, 2026 11:36
michaldengusiak added a commit that referenced this pull request Oct 20, 2026
…th one accepted limitation [skip ci]

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant