19 changes: 10 additions & 9 deletions config/default_config.yaml
Original file line number Diff line number Diff line change
Expand Up @@ -11,7 +11,7 @@ paths:
results_dir: "results/"
costs_dir: "resources/data/costs/default"
yearly_regional_load:
ac: "resources/data/load/Provincial_Load_2020_2060_MWh.csv"
ac: "resources/data/load/Provincial_Load_2020_2060_MWh.csv" # 2025 load is repalced by the 2024 national bureau of statistics: https://data.stats.gov.cn/easyquery.htm?cn=E0103
# conversion factor to MWh in case ac load file in another unit
ac_to_mwh: 1
#TODO merge into paths
Expand All @@ -25,6 +25,7 @@ scenario:
co2_pathway: ["exp175default"] # co2_scenarios that will be used
topology: "current+FCG" # "current" or "FCG" or "current+FCG" or "current+Neighbor"
planning_horizons:
- 2020
- 2025
- 2030
- 2035
Expand Down Expand Up @@ -314,7 +315,7 @@ solving:
lines:
line_length_factor: 1.25
expansion:
transmission_limit: vopt # opt for optimal (unconstrained), v for volume, c for cost. eg. c1.25 limits cost increase to 25% of the base year
transmission_limit: c1.05 # opt for optimal (unconstrained), v for volume, c for cost. eg. c1.25 limits cost increase to 25% of the base year
base_year: 2020 # base step year, the exp limit is relative to this year

security:
Expand All @@ -326,7 +327,7 @@ existing_capacities:
grouping_years: [1985, 1990, 1995, 2000, 2005, 2010, 2015, 2020, 2025, 2030, 2035, 2040, 2045, 2050, 2055, 2060]
collapse_years: True # Treat as a single unit when preparing & solving network
threshold_capacity: 80 # MW
techs: ['coal','CHP coal', 'CHP gas', 'OCGT', 'CCGT', 'solar', 'onwind', 'offwind', 'nuclear', "PHS"]
techs: ['coal','CHP coal', 'CHP gas', 'OCGT', 'CCGT', 'solar', 'onwind', 'offwind', 'nuclear', "PHS", "biomass"]
node_assignment: simple # simple | gps


Expand Down Expand Up @@ -374,9 +375,9 @@ fetch_regions:
subsidies:
# New format: subsidies.fuel_type -> province -> value (EUR/MWh) only allowed for negative values (subsidies)
gas:
Guangdong: -8
Jiangsu: -8.5
Zhejiang: -9
Beijing: -10
Tianjin: -10
Shanghai: -10
Guangdong: -10
Jiangsu: -10
Zhejiang: -10
Beijing: -11
Tianjin: -11
Shanghai: -11
6 changes: 3 additions & 3 deletions config/plot_config.yaml
Original file line number Diff line number Diff line change
Expand Up @@ -20,7 +20,7 @@ plotting:
figsize: [10, 8]
figsize_w_additions: [14, 8]
boundaries: [71, 135., 10, 56.]
bus_size_factor: 1.e+10
bus_size_factor: 2.e+10
linewidth_factor: 6.e+3
bus_size_factor_demand: 2.e+7
bus_size_factor_heat: 5.e+4
Expand All @@ -33,9 +33,9 @@ plotting:
energy_map:
figsize: [9, 8]
boundaries: [71, 135., 0, 56.]
bus_size_factor: 4.e+8
bus_size_factor: 8.e+8
bus_size_factor_heat: 2.e+8
linewidth_factor: 7.5e+3
linewidth_factor: 1.2e+4
linewidth_factor_heat: 5.e+3
bus_size_factor_demand: 2.e+7
min_edge_capacity : 5.e+2 # MW
Expand Down
Empty file added git
Empty file.
12 changes: 6 additions & 6 deletions resources/data/costs/default/costs_2020.csv
Original file line number Diff line number Diff line change
Expand Up @@ -348,7 +348,7 @@ coal,2020,FOM,1.6,%/year,Lazard s Levelized Cost of Energy Analysis - Version 13
coal,2020,VOM,3.5,EUR/MWh_e,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
coal,2020,efficiency,0.4391891891891891,per unit,Linear increase from Xiang et al nat energy 2023 to DKEA catalogue 2023 value for 2060,
coal,2020,fuel,8.15,EUR/MWh_th,BP 2019,
coal,2020,investment,3845.51,EUR/kW_e,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
coal,2020,investment,505.3,EUR/kW_e,"https://www.cctd.com.cn/show-19-203452-1.html ""China Power Industry Annual Development Report 2020"" in Chinese",
coal,2020,lifetime,40.0,years,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
csp-tower,2020,FOM,1.0,%/year,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),
csp-tower,2020,investment,144.88,"EUR/kW_th,dp",ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
Expand Down Expand Up @@ -549,11 +549,11 @@ nuclear,2020,FOM,1.4,%/year,Lazard s Levelized Cost of Energy Analysis - Version
nuclear,2020,VOM,3.5,EUR/MWh_e,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
nuclear,2020,efficiency,0.33,per unit,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
nuclear,2020,fuel,2.6,EUR/MWh_th,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
nuclear,2020,investment,6000.0,USD/kW_e,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
nuclear,2020,investment,2520.0,USD/kW_e,"https://www.energypolicy.columbia.edu/wp-content/uploads/2023/12/QCFNuclearCosts-CGEP_Report_112923.pdf""The Uncertain Costs of New Nuclear Reactors: What Study Estimates Reveal about the Potential for Nuclear in a Decarbonizing World""",
nuclear,2020,lifetime,40.0,years,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
offwind,2020,FOM,2.51,%/year,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx","21 Offshore turbines: Fixed O&M [EUR/MW_e/y, 2020]"
offwind,2020,VOM,0.02,EUR/MWhel,RES costs made up to fix curtailment order, from old pypsa cost assumptions
offwind,2020,investment,1804.77,"EUR/kW_e, 2020","Danish Energy Agency, technology_data_for_el_and_dh.xlsx","21 Offshore turbines: Nominal investment [MEUR/MW_e, 2020] grid connection costs substracted from investment costs"
offwind,2020,investment,1804.77,"EUR/kW_e, 2020","“Cost values for 2020–2030 are taken from the Danish Energy Agency dataset technology_data_for_el_and_dh.xlsx. Cost projections for 2030–2060 follow Sun et al. (Prediction of Power System Cost and Price Level Under the Goal of Carbon Peak and Carbon Neutralization, in Chinese).”","21 Offshore turbines: Nominal investment [MEUR/MW_e, 2020] grid connection costs substracted from investment costs"
offwind,2020,lifetime,27.0,years,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",21 Offshore turbines: Technical lifetime [years]
offwind-ac-connection-submarine,2020,investment,2685.0,EUR/MW/km,DEA https://ens.dk/en/our-services/projections-and-models/technology-data, from old pypsa cost assumptions
offwind-ac-connection-underground,2020,investment,1342.0,EUR/MW/km,DEA https://ens.dk/en/our-services/projections-and-models/technology-data, from old pypsa cost assumptions
Expand All @@ -570,7 +570,7 @@ oil,2020,investment,343.0,EUR/kW,"Danish Energy Agency, technology_data_for_el_a
oil,2020,lifetime,25.0,years,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Technical lifetime
onwind,2020,FOM,1.25,%/year,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",20 Onshore turbines: Fixed O&M
onwind,2020,VOM,1.5,EUR/MWh,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",20 Onshore turbines: Variable O&M
onwind,2020,investment,551.28,EUR/kW,zhu et.al.2025,20 Onshore turbines: Nominal investment
onwind,2020,investment,780.0,EUR/kW,"Baseline 2020 cost values are taken from the China Power Industry Annual Development Report 2020, supplemented by CCTD data (https://www.cctd.com.cn) for cross-checks. Future cost reduction trends (2020–2050) follow NREL ATB data (https://atb.nrel.gov) and the NREL ATB TRENDS 2022–2050 report.",20 Onshore turbines: Nominal investment
onwind,2020,lifetime,27.0,years,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",20 Onshore turbines: Technical lifetime
retrofit,2020,VOM,69.0,USD/tCO2,"Lockwood T. A compararitive review of next-generation carbon capture technologies for coal-fired power plant[J]. Energy procedia, 2017, 114: 2658-2670.",
retrofit,2020,investment,180.0,USD/kW,"Fan J L, Xu M, Li F, et al. Carbon capture and storage (CCS) retrofit potential of coal-fired power plants in China: the technology lock-in and cost optimization perspective[J]. Applied energy, 2018, 229: 326-334.",
Expand All @@ -585,7 +585,7 @@ seawater desalination,2020,investment,40219.78,EUR/(m^3-H2O/h),"Caldera et al 20
seawater desalination,2020,lifetime,30.0,years,"Caldera et al 2016: Local cost of seawater RO desalination based on solar PV and windenergy: A global estimate. (https://doi.org/10.1016/j.desal.2016.02.004), Table 1.",
solar,2020,FOM,1.58,%/year,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",22 Rooftop PV residential: Fixed O&M [2020-EUR/MW_e/y]
solar,2020,VOM,0.01,EUR/MWhel,RES costs made up to fix curtailment order, from old pypsa cost assumptions
solar,2020,investment,733.47,EUR/kW_e,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",22 Rooftop PV residential: Nominal investment [2020-MEUR/MW_e]
solar,2020,investment,432.0,EUR/kW_e,"The 2020 baseline cost values are taken from the study Prediction of Power System Cost and Price Level Under the Goal of Carbon Peak and Carbon Neutralization (in Chinese). Future cost reduction trends for 2020–2060 follow Qixing Sun, Chao Zhang, Chengren Li, Peipei You, Xiao Gao, Qian Zhao, Zhao Xu, Sijia Liu, and Li Yanlin. Prediction of Power System Cost and Price Level Under the Goal of Carbon Peak and Carbon Neutralization�� (in Chinese).",22 Rooftop PV residential: Nominal investment [2020-MEUR/MW_e]
solar,2020,lifetime,35.0,years,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",22 Rooftop PV residential: Technical lifetime [years]
solar-rooftop,2020,FOM,1.15,%/year,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",22 Rooftop PV residential: Fixed O&M [2020-EUR/MW_e/y]
solar-rooftop,2020,discount rate,0.04,per unit,standard for decentral, from old pypsa cost assumptions
Expand All @@ -598,7 +598,7 @@ solar-rooftop residential,2020,FOM,1.08,%/year,"Danish Energy Agency, technology
solar-rooftop residential,2020,investment,1124.86,EUR/kW_e,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",22 Rooftop PV residential: Nominal investment [2020-MEUR/MW_e]
solar-rooftop residential,2020,lifetime,35.0,years,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",22 Rooftop PV residential: Technical lifetime [years]
solar-utility,2020,FOM,2.01,%/year,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",22 Utility-scale PV: Fixed O&M [2020-EUR/MW_e/y]
solar-utility,2020,investment,509.47,EUR/kW_e,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",22 Utility-scale PV: Nominal investment [2020-MEUR/MW_e]
solar-utility,2020,investment,324.0,EUR/kW_e,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",22 Utility-scale PV: Nominal investment [2020-MEUR/MW_e]
solar-utility,2020,lifetime,35.0,years,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",22 Utility-scale PV: Technical lifetime [years]
solid biomass,2020,CO2 intensity,0.37,tCO2/MWh_th,Stoichiometric calculation with 18 GJ/t_DM LHV and 50% C-content for solid biomass,
solid biomass,2020,fuel,12.0,EUR/MWh_th,"JRC ENSPRESO ca avg for MINBIOWOOW1 (secondary forest residue wood chips), ENS_Ref for 2040",
Expand Down
12 changes: 6 additions & 6 deletions resources/data/costs/default/costs_2025.csv
Original file line number Diff line number Diff line change
Expand Up @@ -348,7 +348,7 @@ coal,2025,FOM,1.6,%/year,Lazard s Levelized Cost of Energy Analysis - Version 13
coal,2025,VOM,3.5,EUR/MWh_e,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
coal,2025,efficiency,0.4493555405405404,per unit,Linear increase from Xiang et al nat energy 2023 to DKEA catalogue 2023 value for 2060,
coal,2025,fuel,8.15,EUR/MWh_th,BP 2019,
coal,2025,investment,3845.51,EUR/kW_e,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
coal,2025,investment,505.3,EUR/kW_e,"https://www.cctd.com.cn/show-19-203452-1.html ""China Power Industry Annual Development Report 2020"" in Chinese",
coal,2025,lifetime,40.0,years,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
csp-tower,2025,FOM,1.05,%/year,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),
csp-tower,2025,investment,121.52,"EUR/kW_th,dp",ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
Expand Down Expand Up @@ -549,11 +549,11 @@ nuclear,2025,FOM,1.4,%/year,Lazard s Levelized Cost of Energy Analysis - Version
nuclear,2025,VOM,3.5,EUR/MWh_e,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
nuclear,2025,efficiency,0.33,per unit,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
nuclear,2025,fuel,2.6,EUR/MWh_th,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
nuclear,2025,investment,6000.0,USD/kW_e,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
nuclear,2025,investment,2520.0,USD/kW_e,"https://www.energypolicy.columbia.edu/wp-content/uploads/2023/12/QCFNuclearCosts-CGEP_Report_112923.pdf""The Uncertain Costs of New Nuclear Reactors: What Study Estimates Reveal about the Potential for Nuclear in a Decarbonizing World""",
nuclear,2025,lifetime,40.0,years,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
offwind,2025,FOM,2.37,%/year,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx","21 Offshore turbines: Fixed O&M [EUR/MW_e/y, 2020]"
offwind,2025,VOM,0.02,EUR/MWhel,RES costs made up to fix curtailment order, from old pypsa cost assumptions
offwind,2025,investment,1602.34,"EUR/kW_e, 2020","Danish Energy Agency, technology_data_for_el_and_dh.xlsx","21 Offshore turbines: Nominal investment [MEUR/MW_e, 2020] grid connection costs substracted from investment costs"
offwind,2025,investment,1664.16,"EUR/kW_e, 2020","“Cost values for 2020–2030 are taken from the Danish Energy Agency dataset technology_data_for_el_and_dh.xlsx. Cost projections for 2030–2060 follow Sun et al. (Prediction of Power System Cost and Price Level Under the Goal of Carbon Peak and Carbon Neutralization, in Chinese).”","21 Offshore turbines: Nominal investment [MEUR/MW_e, 2020] grid connection costs substracted from investment costs"
offwind,2025,lifetime,30.0,years,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",21 Offshore turbines: Technical lifetime [years]
offwind-ac-connection-submarine,2025,investment,2685.0,EUR/MW/km,DEA https://ens.dk/en/our-services/projections-and-models/technology-data, from old pypsa cost assumptions
offwind-ac-connection-underground,2025,investment,1342.0,EUR/MW/km,DEA https://ens.dk/en/our-services/projections-and-models/technology-data, from old pypsa cost assumptions
Expand All @@ -570,7 +570,7 @@ oil,2025,investment,343.0,EUR/kW,"Danish Energy Agency, technology_data_for_el_a
oil,2025,lifetime,25.0,years,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Technical lifetime
onwind,2025,FOM,1.23,%/year,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",20 Onshore turbines: Fixed O&M
onwind,2025,VOM,1.42,EUR/MWh,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",20 Onshore turbines: Variable O&M
onwind,2025,investment,551.28,EUR/kW,zhu et.al.2025,20 Onshore turbines: Nominal investment
onwind,2025,investment,683.495,EUR/kW,"Baseline 2020 cost values are taken from the China Power Industry Annual Development Report 2020, supplemented by CCTD data (https://www.cctd.com.cn) for cross-checks. Future cost reduction trends (2020–2050) follow NREL ATB data (https://atb.nrel.gov) and the NREL ATB TRENDS 2022–2050 report.",20 Onshore turbines: Nominal investment
onwind,2025,lifetime,28.5,years,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",20 Onshore turbines: Technical lifetime
retrofit,2025,VOM,69.0,USD/tCO2,"Lockwood T. A compararitive review of next-generation carbon capture technologies for coal-fired power plant[J]. Energy procedia, 2017, 114: 2658-2670.",
retrofit,2025,investment,180.0,USD/kW,"Fan J L, Xu M, Li F, et al. Carbon capture and storage (CCS) retrofit potential of coal-fired power plants in China: the technology lock-in and cost optimization perspective[J]. Applied energy, 2018, 229: 326-334.",
Expand All @@ -585,7 +585,7 @@ seawater desalination,2025,investment,36907.69,EUR/(m^3-H2O/h),"Caldera et al 20
seawater desalination,2025,lifetime,30.0,years,"Caldera et al 2016: Local cost of seawater RO desalination based on solar PV and windenergy: A global estimate. (https://doi.org/10.1016/j.desal.2016.02.004), Table 1.",
solar,2025,FOM,1.73,%/year,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",22 Rooftop PV residential: Fixed O&M [2020-EUR/MW_e/y]
solar,2025,VOM,0.01,EUR/MWhel,RES costs made up to fix curtailment order, from old pypsa cost assumptions
solar,2025,investment,612.79,EUR/kW_e,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",22 Rooftop PV residential: Nominal investment [2020-MEUR/MW_e]
solar,2025,investment,366.0,EUR/kW_e,"The 2020 baseline cost values are taken from the study Prediction of Power System Cost and Price Level Under the Goal of Carbon Peak and Carbon Neutralization (in Chinese). Future cost reduction trends for 2020–2060 follow Qixing Sun, Chao Zhang, Chengren Li, Peipei You, Xiao Gao, Qian Zhao, Zhao Xu, Sijia Liu, and Li Yanlin. Prediction of Power System Cost and Price Level Under the Goal of Carbon Peak and Carbon Neutralization�� (in Chinese).",22 Rooftop PV residential: Nominal investment [2020-MEUR/MW_e]
solar,2025,lifetime,37.5,years,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",22 Rooftop PV residential: Technical lifetime [years]
solar-rooftop,2025,FOM,1.26,%/year,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",22 Rooftop PV residential: Fixed O&M [2020-EUR/MW_e/y]
solar-rooftop,2025,discount rate,0.04,per unit,standard for decentral, from old pypsa cost assumptions
Expand All @@ -598,7 +598,7 @@ solar-rooftop residential,2025,FOM,1.16,%/year,"Danish Energy Agency, technology
solar-rooftop residential,2025,investment,942.86,EUR/kW_e,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",22 Rooftop PV residential: Nominal investment [2020-MEUR/MW_e]
solar-rooftop residential,2025,lifetime,37.5,years,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",22 Rooftop PV residential: Technical lifetime [years]
solar-utility,2025,FOM,2.2,%/year,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",22 Utility-scale PV: Fixed O&M [2020-EUR/MW_e/y]
solar-utility,2025,investment,428.52,EUR/kW_e,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",22 Utility-scale PV: Nominal investment [2020-MEUR/MW_e]
solar-utility,2025,investment,324.0,EUR/kW_e,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",22 Utility-scale PV: Nominal investment [2020-MEUR/MW_e]
solar-utility,2025,lifetime,37.5,years,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",22 Utility-scale PV: Technical lifetime [years]
solid biomass,2025,CO2 intensity,0.37,tCO2/MWh_th,Stoichiometric calculation with 18 GJ/t_DM LHV and 50% C-content for solid biomass,
solid biomass,2025,fuel,12.0,EUR/MWh_th,"JRC ENSPRESO ca avg for MINBIOWOOW1 (secondary forest residue wood chips), ENS_Ref for 2040",