You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
[Epic] D0-5 · Documented controls that are not implemented #843
Controls the documentation promises but the code does not implement. Each needs a product decision — implement it or withdraw the claim; until then the documents carry an interim warning.
How to work on it
Every sub-issue below is independent and can be claimed on its own — see CONTRIBUTING.md, Finding Work: Issues and the Project Board. Progress shows in the sub-issue list and in the project's Sub-issues progress field.
Done when
Every sub-issue is closed (fixed, or closed with a reason).
Each code fix has a regression test that reproduces the original failure and asserts the corrected behaviour (exit code, failed gate or correct envelope).
Each documentation fix updates the English page and its Turkish mirror in the same PR.
The release note names the contracts this theme restores.
Found by the October 2026 ForgeLM code and documentation review against commit cab2947. Code links point at that commit; line numbers may have moved since. Finding IDs (CR-…, DOC-…, TECH-…) are stable references for this backlog.
Activity
human_approval.required/grantedenforces trainer ≠ approver (DOC-D1B06-002) #73evaluation.require_human_approval: truefor every high-risk/unacceptable run — 'F-compliance-110 raises ConfigError if you forget.' (DOC-D2B03-003) #90safety: enabled: truein the YAML config the chat REP… (DOC-D2B07-001) #91checkpoints/customer-support/artifacts/with annex_iv_metadata.json, audit_log.jsonl, data… (CR-A02-023) #96