docs: trinity landed on the 14th, carrying Windows and a return window - #492
Merged
Merged
Conversation
The ProDesk was reported bought and delivered. It already was: one order, 2026-09-08, eBay item 237046034784, and `hardware.md` has carried it as `trinity` since it arrived. ADR-0034 decided one box does both jobs and `roadmap.md` says a second is deferred, not ordered, so nothing here is a new purchase and no row on the buy table moves. What the paperwork carries that the documents did not is four things. **The date was a day late.** The carrier's notice puts the drop-off at 15:05 local on 2026-09-14; the commit that recorded it was written that evening and dated by UTC, which had already turned over. Corrected in `hardware.md`, `README.md`, `roadmap.md` and the rehearsal's blocker list. The opening date is a separate reading, taken on the 15th, and stands. The TS150, the boot SSD and the bracket and tape were recorded in that same commit under the same slip and are **not** audited here — `roadmap.md` now says so rather than implying four dates were checked when one was. That is #413's to settle and nothing turns on it. **It arrived carrying Windows 11 Pro.** Recorded because the rehearsal wipes it, and recorded with what it does not mean: the licence is OEM, it dies with the install, and it does not touch the buy table's two Windows 11 Pro keys, which are ADR-0029's lab-domain endpoints and a different machine. **The warranty runs to 2027-09-08.** ADR-0034 accepts that the tier is down until a replacement arrives; inside that year a dead `trinity` has a claim behind it, and after it the ADR's cost is the whole cost. Worth a line in the entry for the box that decision is about. **The seller-return window closes 2026-10-08**, and this is the one that bites. The spec, the serial and the NIC count are still the listing's word rather than the machine's — the entry has said so since it was opened — and the step that would settle them is installing pfSense over the Windows partition, which is also the step that ends the return and the one act of the rehearsal that cannot be taken back. So that reading stops being open-ended and gets a date. It is now the only item on the rehearsal's blocker list with a deadline, and pointedly not one of the two items that list is actually blocked on: the machine can be proved before the I226 card or the installer stick land, and has to be. One correction fell out alongside and is fixed rather than left: the two SM863a SSDs were delivered 2026-09-11 and `roadmap.md` still had them moving. Moved, with a note that the delivery is recorded against the order — one order for the pair — and that both drives being in it is #418's to confirm at the bays. `make check-docs` and `make lint` pass; the buy table and README's "two items now, one later" are untouched, as are the ADR and runbook counts. Refs #92 Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
6 tasks
Gerrrt
added this pull request to stack #499
September 17, 2026 23:19
This was referenced Sep 19, 2026
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
What changed
The ProDesk was reported bought and delivered. It already was — one order, 2026-09-08, and
hardware.mdhas carried it astrinitysince it arrived. ADR-0034 decided one box does both jobs and the roadmap says a second is deferred, not ordered, so nothing here is a new purchase and no row on the buy table moves.What the arrival paperwork carries that the documents did not:
trinityhas a claim behind it.Two smaller things. The TS150, boot SSD and bracket were recorded under the same UTC slip and are not audited here — the roadmap now says so rather than implying four dates were checked when one was (#413's to settle). And the two SM863a SSDs were delivered 2026-09-11 while the roadmap still had them moving; moved, with the caveat that delivery is recorded against the order and both drives being in it is #418's to confirm at the bays.
Why
#92. The purchase half is done; the rehearsal is what remains, and it now has one prerequisite that is not waiting on a package.
Blast radius
Documentation only. No host, VLAN or service is affected.
secrets/*.sops.yamlVerification
python3 scripts/check_docs.py→docs OK — 82 Prometheus + 18 Loki rules, 7 dashboards, 141 panels, 10 assertions./scripts/lint.sh --require-all→lint passedBoth re-run after rebasing onto
fc4490e. The buy table and README's "two items now, one later" are untouched, as are the ADR and runbook counts.make validatepassesLeft alone deliberately
An HP 2.5" drive caddy bought 2026-09-12 appears nowhere in the repo, against the roadmap's rule that a PR implying a purchase edits that section in the same commit. Recording it means saying which machine it is for — most likely
Saruman's SFF bays under #418 — and that is a guess this PR is the wrong place to make. Tracked separately.Refs #92
🤖 Generated with Claude Code