Skip to content

Vulkan: the KHR coopmat kq tile rebuilt (word stage, f16 accumulators, 2x4 tiling), emission-time [unroll_full], the recurrent f16 feed decided per activation buffer - #3978

Merged
borisbat merged 12 commits into
masterfrom
bbatkin/khr-mmq-tile
Sep 9, 2026
Merged

Vulkan: the KHR coopmat kq tile rebuilt (word stage, f16 accumulators, 2x4 tiling), emission-time [unroll_full], the recurrent f16 feed decided per activation buffer#3978
borisbat merged 12 commits into
masterfrom
bbatkin/khr-mmq-tile

the Copilot round: the skip line of the two emitter-suite files this …

bb0b5e2
Select commit
Loading
Failed to load commit list.
Sign in for the full log view