Skip to content

Validate combined beta.9 campaign repairs - #259

Closed
Proxicon wants to merge 17 commits into
mainfrom
test/beta9-integrated-repairs
Closed

Proxicon wants to merge 17 commits into
mainfrom
test/beta9-integrated-repairs

Conversation

@Proxicon

@Proxicon Proxicon commented Oct 21, 2026 •

Copy link
Copy Markdown
Contributor

Purpose

Validate six beta.9 campaign repairs together against normal PR CI, including PostgreSQL: #250, #251, #255, #256, #258, and #260 atop released beta.9 main. The #260 commit cherry-picked cleanly onto the previous five-repair integration head.

Exact-head combined source verification

CI run 39703263575 passed on f2e75ae8709ebb8c34a088e62f40a203d4f26ff8. Downloaded artifacts matched GitHub SHA-256 digests independently: 3,313 .NET tests passed, 8 not executed, 0 failed; 401/401 provider tests passed. All seven archived-mailbox deletion cases, both new SQLite/PostgreSQL administrator-mail routing cases, and seven API mail-truth cases passed in the .NET TRX. Public disclosure, layout, offline harness, and Compose configuration jobs passed. The exact artifact verification is retained under evidence/rateldesk-pr259-six-repair-ci/full-ci-summary.json in the D: campaign root.

The prior five-repair head f23354b3 passed CI run 39696559472, but this new exact-head run supersedes it.

Review and live acceptance

Review and merge the individual repairs through normal repository gates, then close this draft integration PR. Source CI does not establish deployed acceptance. After compatible builds are released and deployed, rerun the exact HTTP MCP failures with independent readback. Direct helpdesk_mail.send remains unaccepted until missing-route rejection and positive global-sender delivery/outbox behavior are proved live.

Copy link
Copy Markdown
Contributor Author

Reconciled and superseded for beta.10. The tree at this draft's exact head f2e75ae is 84676c3370b6982a325e3d0c23f82f2d05f1ce49, identical to the union of the six original repair heads. It contains no unique product changes. The six individual repair PRs #250, #251, #255, #256, #258 and #260 have now merged through source review and their validation gates; #255 additionally includes the reviewed HTTP framing correction at ef67e4d.

Closing this integration-only draft avoids merging duplicate repair commits. Release PR #261 carries the final dependency combination, beta.10 metadata, regression handoff and the terminal compatibility correction discovered by deeper acceptance. That candidate, final main and release artifacts retain their own validation gates. This reconciliation is source integration evidence, not deployment or live campaign acceptance.

@Proxicon Proxicon closed this Oct 23, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant