Skip to content

B4-08: public guides and beta.4 release notes #92

Closed

Description

@boston-ai-agent

Update NetRatel integration guide, canonical Netclaw guide, examples/index links, migration notes, and beta.4 release documentation without secrets or contradictory setup paths. Parent #83.

Activity

  1. boston-ai-agent commented on Sep 26, 2026

    @boston-ai-agent
    ContributorAuthor

    Beta.4 integration status update (2026-09-26):

    • Implementation commit 0f73da7 is pushed on feat/beta4-integration-hub; evidence ledger commit 945fd5d records the final review state.
    • Local final-head validation is green: 1,474 passed, 6 skipped, 0 failed; focused reliability set 73/73; Release build 0 errors; Slopwatch 0 findings; UX setup 1/1 and browser suite 31/31; non-publishing CLI/stdio/deployment archive rehearsal passed.
    • Hosted validation is green in PR run 36263572804 and managed PostgreSQL run 36263572778, including .NET, UX, mailbox lifecycle, Docker, Compose/PostgreSQL, disclosure/layout, release rehearsal, and all archive-runtime jobs.
    • Read-only NetRatel Dev M2M token acquisition and protected health are green. Full deployed RatelDesk ingest/ticket acceptance, paired unchanged Netclaw SignalR acceptance, and deployed CLI/stdio/HTTP MCP journeys remain external gates because no exact authorized target was identified.

    The implementation ledger is here, and PR #94 remains draft. No merge, release, deployment, registry publication, or upstream change was performed.

  2. Proxicon commented on Oct 6, 2026

    @Proxicon
    Contributor

    Completed: the bounded documentation reconciliation merged in corrective PR, merge abd5eaa49cfed28b79c91a31f130559b74220bf9. The canonical NetRatel guide, service-link guide, Netclaw guide, self-hosting guidance and release notes now describe the merged implementation and current setup paths. Final normal validation is normal final-main validation and managed PostgreSQL validation; documentation links and disclosure checks passed as recorded in the PR.

    Post-merge verification is complete: all 17 normal jobs passed on abd5eaa49cfed28b79c91a31f130559b74220bf9; both linked final-main workflows completed successfully.

    Current navigation is /admin/automation/integration, with separate /orchestrator and /netclaw destinations; account credentials remain at /account/integration-credentials. DB-managed Netclaw Pair & connect/re-pair applies at runtime; deployment-managed injected profiles retain their deployment restart/ownership boundary. Legacy aliases/routes and the pinned NetRatel outbound contract are preserved. Historical beta.4/beta.6 notes, original pins and dated release receipts remain historical. The guides distinguish local Release-published protected operations, normally published artifacts and actual two-product evidence; they contain no new acceptance claim for unavailable real providers.

    The existing release continuation published RatelDesk-0.1.1-beta.13 from af71b9f9ae47bf75ea44f9fb486bd5c812d34910 at 08:05 UTC / 10:05 SAST on 6 October (release run 37428393499). It includes #131, and predates both the new worker correction and dependency PR #122; it does not establish their publication or real-peer acceptance.

    This satisfies the public guides/examples/index/migration/release-documentation scope. Closing as completed after all 17 final post-main checks passed; real interoperability remains tracked in #89/#90 and epic #83.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    enhancementNew feature or request

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions