beta.4: Integration hub, scoped credentials, NetRatel orchestration and Netclaw #83
Description
Current M2M scope — owner decision, 9 October 2026
Replacement implementation: BostonTechnologies/netratel#180 ↔ #143.
The owner has retired the old NetRatel ↔ RatelDesk approval/redirect/recovery system and requested pairing codes: Generate a Pairing Code; address + code → Pair & connect; final tenant mapping/name/incident-or-automation capabilities → Save; View/Test/Delete. The replacement owns removal of old runtime/setup records, reviewed source changes, CI, normal merges and next compatible beta artifacts. Do not continue the earlier frozen-protocol, double-consent or manual/fallback setup criteria in this historical tracker.
This programme stays open. Its NetRatel interoperability child #89 now uses the replacement pairing-code foundation. Independent Netclaw child #90 and unrelated account credentials/MCP functionality remain in scope.
The old M2M-only issues are closed as superseded, not as evidence that their failed deployed journeys passed. Historical implementation and test receipts below retain their original meaning. Source/disposable acceptance and the owner’s deployed-beta acceptance must still be reported separately.
Programme for the beta.4 release: deliver the administrator Integration hub with separate NetRatel orchestrator, Netclaw AI harness, and account integration-credential destinations. Includes secure persisted provider configuration with canonical Orchestrator__ and Netclaw__ aliases, legacy compatibility, runtime application, protected secrets, scoped credential and local MCP verification, diagnostics, migrations, docs, and release rehearsal. Preserve existing account credential, CLI/stdio, HTTP MCP, callback, and reverse-auth boundaries. Do not modify NetRatel or Netclaw upstream, merge, tag, publish, promote, deploy, or change protection. Child phases: B4-00 baseline; B4-01 provider configuration; B4-02 credential lifecycle; B4-03 CLI/stdio; B4-04 HTTP MCP; B4-05 NetRatel; B4-06 Netclaw; B4-07 hub UX; B4-08 docs/release notes; B4-09 validation/readiness.
Current reconciliation — 6 October 2026
The historical programme/authority text above is retained. Its old draft/no-merge wording describes the original beta.4 task; the current reconciliation goal separately authorized reviewed in-scope RatelDesk merges through unchanged required gates. Implementation is already merged through PR #94 and later follow-ups. Current receipt: #132, merge abd5eaa49cfed28b79c91a31f130559b74220bf9; normal main validation https://github.com/BostonTechnologies/rateldesk/actions/runs/37437602554 and managed PostgreSQL https://github.com/BostonTechnologies/rateldesk/actions/runs/37437602528.
Post-merge verification is complete: all 17 normal jobs passed on abd5eaa49cfed28b79c91a31f130559b74220bf9; both linked final-main workflows completed successfully.
- B4-00: baseline inventory and compatibility ledger #84 — B4-00 baseline inventory and compatibility ledger: historical pins/receipts preserved and current reconciliation merged.
- B4-01: secure persisted provider configuration and runtime application #85 — B4-01 secure provider configuration/runtime: canonical aliases/legacy precedence, protected profiles and revision/runtime regression evidence.
- B4-02: scoped integration credentials and account UX parity #86 — B4-02 scoped credentials/account UX: lifecycle/current-authority and tenant projection; published local-stack protected operations.
- B4-03: packaged CLI and stdio MCP credential verification #87 — B4-03 packaged CLI/stdio: isolated/pinned processes and extracted-archive protected operations.
- B4-04: local HTTP MCP purpose/resource/delegation verification #88 — B4-04 HTTP MCP: exact resource/purpose/caller-bound delegation, scoped denial and revocation.
- B4-05: NetRatel M2M adapter and interoperability #89 — B4-05 NetRatel interoperability: accepted final real peer suite and explicit supported legacy M2M ingest/callback/uncertain-outcome acceptance remain pending.
- B4-06: Netclaw options, setup UI, and authenticated diagnostics #90 — B4-06 Netclaw real-daemon acceptance: authorized exact daemon/device/version/endpoint/operator; pairing/session/message/approval/reconnect/restart/runtime/provider-owner proof remain pending.
- B4-07: Integration hub navigation and responsive UX #91 — B4-07 Integration hub UX: authorized destinations, compatible routes, credential discovery and responsive/browser evidence.
- B4-08: public guides and beta.4 release notes #92 — B4-08 public guides/release notes: bounded current setup/status reconciliation, preserved historical release receipts.
- B4-09: integrated validation, release rehearsal, and readiness #93 — B4-09 repository validation/readiness: build/security/migrations/UX, nonpublishing rehearsal, available disposable protected operations and non-draft merged handoff.
Eight children complete, two provider-acceptance children open. #93's original disposable-check scope was “where available”; closing that tracker does not establish unavailable real-provider acceptance. Keep #83 open and close it last when #89/#90 meet their accepted functionality. The historical beta.4 milestone does not request a revert or another beta.4 release.
RatelDesk beta.13 is now normally published from af71b9f9ae47bf75ea44f9fb486bd5c812d34910 (release run 37428393499), containing #131 but predating the current worker correction and dependency #122. Source availability/publication/actual acceptance remain separate.
The existing NetRatel #166 owner tested integration merge c1272be6f1aed7925a239bd1effbb49d4bf66a95, reviewed head d5bfa08550bd303e2d5d1388ed71336404c45fbc, in run 37433948570 against published RatelDesk beta.13. It finished cancelled at 08:45:33 UTC with 20 execution jobs (16 successful, three failed, one cancelled), a failed aggregate gate and skipped final guards. Its complete API Integration TRX is 42 passed / 10 failed / 0 skipped; both precommit-cancellation roles passed, both unlink roles failed with HTTP 429, only NetRatel-initiated native completion passed, and one manual RatelDesk-issuer rotation passed. These partial criteria are mapped in #89; they are not accepted final functionality. Keep the epic and its provider children open, preserve the existing owner and exact published-artifact boundary.
At 08:47 UTC / 10:47 SAST on 6 October, the latest observed open NetRatel #166 head is ef2e1467623e8d9ce7035e9025ce794967188732, owned by Proxicon. The d5bfa085/c1272be6 identities above belong to the completed cancelled run and are not the current head. Remaining accepted results are pending with that existing continuation.
Final repository checkpoint: the existing owner's newer NetRatel run 37438102230 is still in progress on ef2e1467623e8d9ce7035e9025ce794967188732, with no accepted conclusion. Reuse that owner's results; the completed d5/c127 receipts above are historical.
Activity
Proxicon commentedon Sep 26, 2026
Implementation is on
feat/beta4-integration-hub; review handoff is PR #94. Repository-scoped beta.4 work and non-publishing release rehearsal are complete. Live unchanged-target NetRatel M2M and Netclaw paired-device interoperability remain explicit acceptance steps for an authorized integration environment. No upstream changes, merge, tag, publish, promotion, deployment, or protection changes were made.boston-ai-agent commentedon Sep 26, 2026
Beta.4 integration status update (2026-09-26):
0f73da7is pushed onfeat/beta4-integration-hub; evidence ledger commit945fd5drecords the final review state.The implementation ledger is here, and PR #94 remains draft. No merge, release, deployment, registry publication, or upstream change was performed.
Proxicon commentedon Oct 6, 2026
Current reconciliation merged in corrective PR, merge
abd5eaa49cfed28b79c91a31f130559b74220bf9; ledger, normal final-main validation and managed PostgreSQL validation.Post-merge verification is complete: all 17 normal jobs passed on
abd5eaa49cfed28b79c91a31f130559b74220bf9; both linked final-main workflows completed successfully.Eight repository-scoped children are complete: #84–#88 and #91–#93. The implementation is already merged through #94 and subsequent Netclaw/service-link follow-ups. PR #94 became non-draft and merged on 27 September 2026; its retained branch is not unmerged work. The #93 closure covers its original repository-validation/handoff and available disposable-check scope, not unavailable real-provider acceptance.
The existing owner's NetRatel run 37433948570, reviewed head
d5bfa08550bd303e2d5d1388ed71336404c45fbcand tested integration mergec1272be6f1aed7925a239bd1effbb49d4bf66a95, finished cancelled at 08:45:33 UTC / 10:45:33 SAST on 6 October against published beta.13af71b9f. Its 21 checks comprise 20 execution jobs (16 successful, three failed, one cancelled .NET job) plus a failed aggregate gate; final general/native guards were skipped. Artifact 11400136247 contains a completed API Integration TRX (52 executed, 42 passed, 10 failed, 0 skipped; service-link subset 32 executed, 22 passed, 10 failed, 0 skipped). This is completed per-project evidence, not an accepted overall reciprocal suite. The #89 receipt records the exact peer identities/results. Keep the original unproven acceptance criteria pending and reuse the existing owner's continuation.A fresh read at 08:47 UTC / 10:47 SAST on 6 October found the open NetRatel #166 continuation at newer head
ef2e1467623e8d9ce7035e9025ce794967188732, owned by Proxicon. Thed5bfa085reviewed head andc1272be6integration merge identify the completed cancelled run above, not the latest continuation head. At the 08:50:32 UTC checkpoint the existing owner's run 37438102230 was in progress at that ef2 head, without a conclusion. Its PR body describes fixture pacing within unchanged rate-limit windows and explicit bootstrap tenant selection; that author report is not a completed CI receipt. Reuse the owner's current run and immutable results rather than starting another programme.Keep this epic open. #89 still needs accepted exact-peer M2M/catalog/payload/ingest/execution/callback/replay/uncertain-outcome evidence, including the supported legacy contract. #90 still needs the authorized real paired-daemon/device journey with its exact version/endpoint/operator and message/approval/reconnect/restart/runtime/provider-ownership proof. Their original acceptance boundaries remain unchanged.
The existing release continuation published RatelDesk-0.1.1-beta.13 from
af71b9f9ae47bf75ea44f9fb486bd5c812d34910at 08:05 UTC / 10:05 SAST on 6 October (release run 37428393499). It includes #131, and predates both the new worker correction and dependency PR #122; it does not establish their publication or real-peer acceptance.The rollup checklist reflects these dispositions; close the epic only after #89 and #90 satisfy their outstanding accepted functionality.