Skip to content
This repository was archived by the owner on Mar 30, 2026. It is now read-only.

Latest commit

 

History

History
79 lines (66 loc) · 3.11 KB

File metadata and controls

79 lines (66 loc) · 3.11 KB

MCP Connection Hub - Project Progress

This document tracks the implementation progress of the MCP Connection Hub project.

Phase 1: Foundation & Core API

Milestone 1.1: Project Setup (Week 1)

  • Create basic project structure and repository
  • Set up Docker configuration and docker-compose file
  • Implement SQLite database initialization
  • Configure Docker volume for persistence
  • Status: Completed
  • Notes: Project structure, Docker configuration, and database initialization implemented.

Milestone 1.2: FastAPI Core (Week 1-2)

  • Implement FastAPI application with basic routing
  • Create OpenAI-compatible API endpoint structure
  • Add API key authentication middleware
  • Implement Pydantic models for request/response
  • Status: Completed
  • Notes: Basic FastAPI application with OpenAI-compatible endpoint structure and authentication implemented.

Milestone 1.3: Tool Registry Framework (Week 2)

  • Implement Pluggy-based tool registry system
  • Create tool registration interface
  • Add tool discovery and initialization
  • Implement tool capability reporting
  • Status: Completed
  • Notes: Tool registry using Pluggy implemented with base tool structure and discovery mechanism.

Milestone 1.4: Configuration System (Week 2-3)

  • Create Pydantic Settings management
  • Implement environment variable loading
  • Add configuration persistence in SQLite
  • Create tool-specific configuration models
  • Status: Completed
  • Notes: Configuration system implemented with environment variable support and Pydantic settings.

Milestone 1.5: CLI Foundation (Week 3)

  • Create CLI framework with command structure
  • Implement basic tool management commands
  • Add configuration viewing and editing
  • Create system status commands
  • Status: Completed
  • Notes: Command-line interface implemented using Typer and Rich, with commands for tool management, configuration, and system status.

Phase 2: Core Engine Capabilities

Milestone 2.1: Tool Response Standardization (Week 3)

  • Create standardized response format for all tools
  • Implement common error handling wrapper
  • Add response validation middleware
  • Create response transformation utilities
  • Status: Not Started

Milestone 2.2: Logging System (Week 3-4)

  • Implement Loguru-based logging framework
  • Add request/response logging
  • Create error logging with stack traces
  • Implement log rotation and persistence
  • Status: Not Started

Milestone 2.3: Testing Framework (Week 4)

  • Set up pytest testing environment
  • Create tool mock system for testing
  • Implement API endpoint tests
  • Create test fixtures and utilities
  • Status: Not Started

Milestone 2.4: Brave Search Connector (Week 4-5)

  • Implement Brave Search API client
  • Create request/response models for search
  • Register with tool registry system
  • Add integration tests for Brave Search
  • Status: Not Started

Current Focus

  • Implementing Tool Response Standardization for Milestone 2.1
  • Setting up the Logging System for Milestone 2.2